Drawing for BUILDING HORIZONS

USPTO serial 79447008

BUILDING HORIZONS

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
JENKINS, KEISHA MONIQUE HARD
Law office
TMO LAW OFFICE 112

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with BUILDING HORIZONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys, ores; metal building materials; buildings, transportable, of metal; non-electric cables and wires of common metal; small items of metal hardware; containers of metal for storage or transport; bridge bearings [construction materials] of metal; metal railings for bridges; anchor bolts of metal for bridge connection; bridge units of metal; temporary bridges of metal; bridges [structures] of metal; railway material of metal; cast iron material for railroad tracks; railway material of metal.ACTIVE—
007Motors, other than for land vehicles; machine coupling and transmission components [except for land vehicles]; agricultural implements other than hand operated hand tools; bitumen making machines; machines for mixing asphalt; asphalt paving machines; railroad constructing machines; tunnelling machines; tunnel boring machines.ACTIVE—
019Non-metallic materials for building and construction; rigid pipes, not of metal, for building; building and construction materials and elements made of pitch, tar, bitumen or asphalt; structures and transportable buildings, not of metal; monuments, not of metal; materials for making and coating roads; roadways of non-metallic materials; bitumen for use in road construction; bedding-in compositions for use in road works; roadways of non-metallic materials; tar-based driveway sealants; cement; mortar; concrete; asphalt; asphalt [for building purposes], asphalt paving.ACTIVE—
037Construction services; mining extraction, oil and gas drilling; electric appliance installation; machinery installation, maintenance and repair; vehicle maintenance and repair; road construction; building of motorway networks; construction of motorways; construction of motorways on request; construction of tunnels; tunnelling; tunnels (drilling of -); construction of railways; construction of railway roadbeds.ACTIVE—
039Transport; packaging and storage of goods.ACTIVE—
040Recycling of waste and trash; air purification and water treatment; printing; metal tempering; metal treating; metal casting; soldering; welding services.ACTIVE—
042Scientific and technological services and research and design relating thereto; industrial analysis, industrial research and industrial design services; quality control and authentication services; design and development of computer hardware and software; technical consultancy regarding the field of road cutting technology.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 18, 2026RFNTREFUSAL PROCESSED BY IB—
May 30, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 30, 2026RFRRREFUSAL PROCESSED BY MPU—
Apr 18, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 17, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 16, 2026DOCKASSIGNED TO EXAMINER—
Apr 3, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 3, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 2, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance