USPTO serial 79447155
Reviewed by CopyMark Law Group
Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Charles T.J. Weigell
Charles T.J. Weigell Fross Zelnick Lehrman & Zissu, P.C.151 W 42nd Street, 17th FloorNew York, NY 10036United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Prefabricated metal buildings; transportable metal constructions; general purpose metal storage containers | ACTIVE | — |
| 009 | Voltage stabilizing power supply; voltage regulators for electric power; electric installations for the remote control of industrial operations; remote controls for air-conditioning apparatus; electric control devices for energy management; mounting racks for computer hardware; electrical connectors; connectors for electronic circuits; temperature sensors; coolant-temperature sensors; central processing unit coolers; electric locks; computer systems comprised of computer hardware and embedded operating system software; electronic calculators; computer servers; computer network server; computer network server used for cloud computing | ACTIVE | — |
| 011 | Air conditioning apparatus for industrial use; air cooling apparatus; radiators for industrial air-conditioning purposes; heat pumps; heat exchangers, other than parts of machines | ACTIVE | — |
| 037 | Installation, repair and maintenance of computers and computer peripherals; installation, maintenance and repair of refrigerating apparatus; repair and maintenance of air-conditioning apparatus for industrial purposes; installation of heating and cooling apparatus; building construction; installation of building insulation; installation of electrical wiring; telecommunication wiring; building construction supervision services for building projects; construction consultation; maintenance and repair of buildings | ACTIVE | — |
| 038 | Telecommunication access services; providing third party users with access to telecommunication infrastructure; leasing of telecommunication equipment | ACTIVE | — |
| 040 | Custom manufacture of computers for others; custom manufacture of computer network servers, computer network server mounting racks and data storage devices; custom manufacture of data centers; custom manufacture of apparatus for cooling data centers, and computer network server mounting racks for use in data centers | ACTIVE | — |
| 042 | Rental of web servers and co-location servers for containerized data centers of others; leasing of data center facilities; rental of web servers; leasing of computers; server hosting; computer design services; computer hardware development; development, updating and maintenance of software and database systems; software as a service (SAAS) services featuring software for application and database integration; computer services, namely, cloud hosting provider services; providing virtual computer systems through cloud computing; providing databases as a service (DBaaS), namely, cloud hosting provider services for the hosting of computer databases for others; Infrastructure as a service (IAAS) services being hosting servers for use by others; consulting services in the field of cloud computing; engineering design services; electrical engineering; mechanical engineering; telecommunications engineering consultancy | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 15, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 15, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 10, 2026 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 9, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 26, 2026 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 26, 2026 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 17, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 17, 2026 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 17, 2026 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 17, 2026 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 17, 2026 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 14, 2026 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 14, 2026 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 14, 2026 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 11, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 24, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 24, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 10, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 9, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 3, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 3, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 2, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |