Drawing for POWERTECH THE POWER OF TRUST. THE FUTURE OF ENERGY.

USPTO serial 79447723

POWERTECH THE POWER OF TRUST. THE FUTURE OF ENERGY.

Reviewed by CopyMark Law Group

Status 640Office Action
Filing date
Status date
Registration date
—
Examiner
MORRIS, KRISTINA KLOIBER
Law office
TMO LAW OFFICE 116

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 640: Status 640 means the examining attorney has prepared a non-final Office Action but it has not been mailed or e-mailed yet. The action should appear in TSDR soon, and a response deadline will start once it is issued.

Need help with POWERTECH THE POWER OF TRUST. THE FUTURE OF ENERGY.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Computer software for modelling, simulating and monitoring the stability/security of power systems; computer software for the analysis and management of electric power systems, energy infrastructure and industrial infrastructure; computer software for grid management and electrical asset management; computer software for power system analysis, namely, for dynamic security assessment, grid stability analysis, powerflow analysis, contingency analysis, grid behavior simulation, and power system planning of electrical grids; computer software for real-time and offline simulation, monitoring, and visualization of conditions in an electric power system; computer software for modelling, model validation, and control tuning of electric power systems.ACTIVE—
042Providing temporary use of non-downloadable software for modelling, simulating and monitoring the stability/security of power systems; providing temporary use of non-downloadable software for the analysis and management of electric power systems, energy infrastructure and industrial infrastructure; providing temporary use of non-downloadable software for grid management and electrical asset management; providing temporary use of non-downloadable software for power system analysis, namely, for dynamic security assessment, grid stability analysis, power flow analysis, contingency analysis, grid behavior simulation, and power system planning of electrical grids; providing temporary use of non-downloadable software for real-time and offline simulation, monitoring, and visualization of conditions in an electric power system; providing temporary use of non-downloadable software for modelling, model validation, and control tuning of electric power systems; software as a service (SaaS) featuring software for modelling, simulating and monitoring the stability/security of power systems; software as a service (SaaS) featuring software for the analysis and management of electric power systems, energy infrastructure and industrial infrastructure; software as a service (SaaS) featuring software for grid management and electrical asset management; software as a service (SaaS) featuring software for power system analysis, namely, for dynamic security assessment, grid stability analysis, power flow analysis, contingency analysis, grid behavior simulation, and power system planning of electrical grids; software as a service (SaaS) featuring software for real-time and offline simulation, monitoring, and visualization of conditions in an electric power system; software as a service (SaaS) featuring software for modelling, model validation, and control tuning of electric power systems; laboratory testing services for the purposes of ensuring safety, performance, reliability and regulatory compliance of assets in the energy, transportation and infrastructure sectors; engineering services in the field of energy systems, including failure analysis, modelling, and design support for utilities, manufacturers, and industrial clients; scientific and technological consultation in the field of grid modernization, asset management, and energy infrastructure; technical consultation in the field of power and energy supply; technical consultation in the field of power generation, transmission, and distribution; design and development of computer software for power system analysis, grid monitoring, and energy management; on-site inspection, testing, diagnostics and condition assessments of energy and industrial infrastructure for utilities and industrial clients; research and development in the field of hydrogen fueling infrastructure, electric vehicle charging systems, and renewable energy technologies; laboratory testing services, namely, testing of industrial equipment and materials for mechanical, chemical, and structural integrity; consultation in the research and development of hydrogen power and hydrogen power-related projects; research and development of hydrogen power and hydrogen power-related projects; design consulting in the field of hydrogen energy systems; engineering project management services in the field of hydrogen energy systems; technological consulting services in the development and operation of smart grid technology; consulting services in the field of energy usage management; consulting services in the field of renewable energy; project management in the field of alternative energy generation; research and development in the field of hydroelectric energy; research and development of technology in the field of electric vehicle energy storage and distribution; scientific research and development in the field of renewable energy resources.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 27, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 26, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 5, 2026DOCKASSIGNED TO EXAMINER—
Apr 10, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 10, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 9, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance