USPTO serial 79448240
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Roofing of metal incorporating solar cells; mounting structures of metal for solar panels. | ACTIVE | — |
| 009 | Photovoltaic apparatus and installations for producing solar electricity; electronic and electric apparatus and instruments including their parts for photovoltaic energy production. | ACTIVE | — |
| 037 | Installation, maintenance and repair of foldable photovoltaic roofing systems; installation, maintenance and repair of photovoltaic installations; installation of photovoltaic cells and photovoltaic modules; maintenance and repair of photovoltaic installations. | ACTIVE | — |
| 042 | Design and development of software for control, regulation and monitoring of solar energy systems; design and development of photovoltaic systems and foldable photovoltaic roofing systems. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 20, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 23, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 23, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 5, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 4, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 4, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 23, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 23, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 16, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |