Drawing for SOLIDWATTS

USPTO serial 79448522

SOLIDWATTS

Reviewed by CopyMark Law Group

Reg. 8481380Status 700Registered
Filing date
Status date
Registration date
Oct 6, 2026
Examiner
MAHMOUDI, MARIAM AZIZ
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SOLIDWATTS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrea L. HIntz

Andrea L. HIntz Resonate IP, LLCP.O. Box 1650Bend, OR 97709United States

Goods and services

ClassDescriptionStatusFirst use
007Current generator; AC generator; high-frequency AC generatorACTIVE—
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; energy distribution or control machines and apparatus, namely, distribution transformers, electric power distribution machines, electrical power distribution units, electric control devices for energy management; electric power or impedance control or regulation machines and apparatus, namely, electric control devices for energy management, voltage regulators for electric power; power capacitors; impedance matching networks, namely, electric resistors, electrical inductors, capacitors; electrical and electronic control apparatus for use with warming and heating apparatus or installations; power amplifiers, especially semiconductor power amplifiers, microwave power amplifiers and radio frequency amplifiers; semiconductors; downloadable and recorded software for use in configuring and operating power distribution transformers; downloadable and recorded software for command and control of energy distribution machines; downloadable and recorded software for controlling the security of an energy distribution system; downloadable and recorded software for online design and monitoring of an electric energy impedance matching networkACTIVE—
042Scientific and technological services, namely, scientific analysis and testing in the field of energy technology and research and design services relating thereto; industrial analysis in the field of energy technology; industrial research in the field of energy technology; industrial design services; quality control for others; authentication services, namely, user authentication services using single sign-on technology for online software applications, electronic document and e-mail authentication services; engineering; electrical engineering services; engineering services in the field of energy technology; engineering services relating to energy supply systems; research in the field of materials science and electrical engineering; technological analysis relating to third-party energy and electricity needs; analysis and testing of electrical engineering apparatus; technical design and planning of warming and heating installations; design and development of energy and power systems; design and development of power amplifiers, especially semiconductor power amplifiers, microwave power amplifiers and radio frequency amplifiers; advice with respect to energy saving, namely, consulting services in the fields of energy measurement to improve energy efficiency; technological advice in the field of engineering, designing power generation technology; services provided by technological consultants, namely, technological consulting in the field of engineering, designing power generation technology; design of electric energy impedance matching networksACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 6, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 6, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 18, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 18, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 12, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 23, 2026RFNTREFUSAL PROCESSED BY IB—
Jul 23, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 22, 2026TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 22, 2026CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2026TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 5, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 5, 2026RFRRREFUSAL PROCESSED BY MPU—
May 19, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 18, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 11, 2026DOCKASSIGNED TO EXAMINER—
Apr 24, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 24, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 23, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance