USPTO serial 79450479
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Civil engineering equipment in the nature of pile driving machines, earthmoving equipment in the nature of excavators mounted vibratory hammers, construction equipment in the nature of hydraulic excavators, oil and gas extraction and mining equipment in the nature of drilling rigs, and equipment for construction work in the field of flood and inundation protection, namely, concrete vibrators and other machines for ramming, pulling and compacting in the nature of pneumatic pipe-ramming machinery and auxiliary supportive devices, drive units for construction machines, connecting yokes being parts of machines, clamping devices in the nature of clamps for use in the precision clamping of work pieces, hydraulically actuated tools in the nature of safety pliers and mounted power drills; parts and accessories for all the aforesaid goods, included in this class; structural and replacement parts and accessories for all the aforesaid goods, included in this class. | ACTIVE | — |
| 037 | Underground civil engineering services, namely, construction of civil engineering structures, earthworks services in the nature of excavating for building construction, steel structure construction works, oil and gas extraction works, mining extraction and construction works for flood and inundation protection in the nature of installation of flood protection equipment; rental of tools, plant in the nature of construction machinery and equipment being pile drivers, vibratory hammers, hydraulic presses and equipment for civil engineering, earthworks, construction works, oil and gas extraction works, mining extraction and construction works for flood and inundation protection; maintenance relating to tools, construction machines and apparatus for civil engineering, earthworks, construction, oil and gas extraction, mining and construction relating to flood and overflow protection. | ACTIVE | — |
| 042 | Scientific and technological services namely, engineering design, technical consulting, structural analysis, and testing of construction in the fields of civil engineering, earthworks, construction works, oil and gas extraction works, mining extraction and flood and inundation protection; engineering services in the field of civil engineering, earthworks, construction works, oil and gas extraction works, mining extraction and flood and inundation protection; testing, user authentication and quality control of computer software for others in the fields of civil engineering, earthworks, construction works, oil and gas extraction works and mining extraction; engineering services in the nature of technical examination of tools, construction machines and apparatus for civil engineering, earthworks, construction, oil and gas extraction, mining and construction relating to flood and overflow protection. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 3, 2026 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 15, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 15, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 13, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 12, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2026 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jun 12, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 11, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 1, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 1, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 1, 2026 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| May 21, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |