Drawing for THE MOST TRUSTED LEADER IN RELIABLE POWER

USPTO serial 79450502

THE MOST TRUSTED LEADER IN RELIABLE POWER

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
JOHNSON, BRITTANY S
Law office
TMO LAW OFFICE 126

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with THE MOST TRUSTED LEADER IN RELIABLE POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
035Business management, operation, organization and administration of electricity generation, transmission and distribution facilities; public utilities cost management services; auditing utility rates for others, and negotiating energy rates and services for others; business information management to optimize electrical energy production and equipment; marketing services, such as, market research services, market analysis and studies services, marketing consulting services, and developing of marketing strategies for others; market analysis in the field of energy trading; providing consumer product information in the field of energy.ACTIVE—
036Commodity trading in environmental commodities, physical electric energy and natural gas; commodity energy trading services; commodity price swaps, financial derivatives, and trading of financial instruments in electric energy and natural gas and related products; financial management of electricity generation; trading of renewable energy credits.ACTIVE—
037Development and construction of electric energy generation, transmission and distribution facilities; development and construction of wind farms and wind energy projects; development and construction of solar farms and solar energy projects; development and construction of renewable energy power production facilities; construction, maintenance and repair of energy supply system for customers; commercial electrical power services, such as, installation, operation and maintenance of secondary electrical services; real estate development services and building construction services; reclamation of land and restoration of coal mining electricity generation facilities; repair services for electricity generation equipment; maintenance services for preserving electricity generation sites; electrical grid reliability and other ancillary services, such as, installation, maintenance and repair of electrical power grids; installation, maintenance and repair of energy generation equipment.ACTIVE—
039Transmission and distribution of electric and thermal energy and its byproducts; public utility services in the form of the transmission and distribution of electric and thermal energy; transport of electric energy by-products to customers.ACTIVE—
040Production of energy; generation of electricity; generation of electricity and power through energy transformation using a fuel input; production of electric and thermal energy; production of electric and thermal energy from coal, natural gas, wind power, solar power, hydroelectric power pumped storage, hydrogen, battery storage and any other fuel types; production of hydroelectric energy through use of water.ACTIVE—
041Provision of education, training, and apprenticeship programs in the fields of electric energy, thermal energy, and renewable energy generation, transmission and distribution.ACTIVE—
042Design of electric energy, transmission and distribution facilities; design of electric energy, thermal energy and natural gas delivery and activation systems; design of electricity production facilities; design of energy supply system for customers; provision of information regarding energy use and efficiency energy consumption audits of facilities; electricity utility services, such as, electricity power supply monitoring, problem detection reporting and restoration services; monitoring and diagnostic information services for the operation failure detection of electric and thermal energy generation, transmission and distribution systems; consulting services in the field of energy management, energy usage and energy conservation, energy storage, renewable energy, and alternative energy generation; design of information technology systems to manage electric energy generation.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2026RFNTREFUSAL PROCESSED BY IB—
Sep 23, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 23, 2026RFRRREFUSAL PROCESSED BY MPU—
Jun 26, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 25, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2026DOCKASSIGNED TO EXAMINER—
Jun 2, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 2, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 21, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance