Drawing for STEP FORWARD TO FUSION ENERGY

USPTO serial 79450901

STEP FORWARD TO FUSION ENERGY

Reviewed by CopyMark Law Group

Status 640Office Action
Filing date
Status date
Registration date
—
Examiner
BLAZICH, JOAN MICHELE
Law office
TMO LAW OFFICE 122

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 640: Status 640 means the examining attorney has prepared a non-final Office Action but it has not been mailed or e-mailed yet. The action should appear in TSDR soon, and a response deadline will start once it is issued.

Need help with STEP FORWARD TO FUSION ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Scientific research and laboratory apparatus, educational apparatus and simulators; scientific apparatus and instruments; scientific, research, surveying, photographic, audiovisual, optical, weighing, measuring, signalling, detecting, testing, inspecting, and teaching apparatus and instruments; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; magnets; electromagnets; superconductive magnet apparatus; energy control devices; electric control devices for energy management; energy regulators; apparatus for monitoring electrical energy consumption; computer software for energy management and energy measurement; computer software for analysing and managing nuclear reactors and nuclear facilities; parts and fittings for the aforementioned goods; all of the aforesaid goods in relation to fusion energyACTIVE—
011Nuclear reactors; nuclear generators; nuclear installations; nuclear power plant installations; tokamaks for generating nuclear energy; installations for processing nuclear fuel and nuclear moderating material; parts and fittings for the aforementioned goodsACTIVE—
037Construction; building and construction services; industrial construction; heavy engineering construction; construction of nuclear reactors; construction of nuclear power plants; servicing of nuclear plants; cleaning of nuclear plants; repair and maintenance of nuclear power plants; providing information relating to the repair or maintenance of nuclear power plants; consultancy, advisory and information services relating to all of the aforementioned servicesACTIVE—
040Generation of energy; energy production; production of energy by nuclear power plants; generation of electricity from nuclear fusion; electricity generation; processing of nuclear fuels; processing and treatment of radioactive and other hazardous wastes; providing information relating to nuclear energy production; consultancy, advisory and information services relating to all of the aforementioned servicesACTIVE—
041Education; cultural activities; organisation of conferences, exhibitions and symposiums for educational and informational purposesACTIVE—
042Scientific research and analysis; scientific research and analysis in the field of nuclear fusion energy; scientific and technological services and research and design in the field of plasma physics; engineering research; engineering research in the field of design, development and construction of nuclear power plants; engineering services for the design of structures; industrial design; engineering design; design of industrial plants; engineering and industrial design of nuclear power plants; nuclear engineering services; consultancy services relating to nuclear engineering; preparation of technical, scientific, engineering, design and research reports relating to commissioning of nuclear units; construction engineering services, namely construction design; design and development of nuclear power plants; design and development of tokamak fusion power devices for energy production; design and development of high temperature superconducting magnets; design and development of energy distribution networks; design and development of energy management and energy measurement software; design and development of computer software for analysing and managing nuclear reactors and nuclear facilities; consultancy, advisory and information services relating to all of the aforementioned services; all of the aforesaid services in relation to fusion energyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 12, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 11, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2026RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Sep 3, 2026ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 2, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 1, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 6, 2026DOCKASSIGNED TO EXAMINER—
Jun 5, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 5, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 28, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance