USPTO serial 79451333
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 019 | Building timber; marble; ceramic tiles; refractory construction materials, not of metal; railway sleepers, not of metal; building materials, not of metal; buildings, not of metal; window glass for building; coatings [building materials]; fireproof cement coatings | ACTIVE | — |
| 020 | Placards of wood or plastics; beds for household pets; furniture fittings, not of metal; door fittings, not of metal; furniture; boxes of wood or plastic; work benches; picture frames; bamboo furniture; works of art of wood, wax, plaster, plastic or resin | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 27, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 27, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 23, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 22, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 21, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 9, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 9, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 4, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |