Drawing for FJÄLL

USPTO serial 79452997

FJÄLL

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
POLZER, NATALIE M
Law office
TMEG LAW OFFICE 108

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with FJÄLL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charlene A. Azema

Charlene A. Azema Knobbe, Martens, Olson & Bear, LLP2040 Main Street, 14th FloorIrvine, CA 92614United States

Goods and services

ClassDescriptionStatusFirst use
001Fuel for nuclear reactors; moderating materials in the nature of liquid lead for nuclear reactorsACTIVE—
004Electrical energy; electrical energy from renewable sources.ACTIVE—
006Prefabricated modular metal structures; modular portable metal structures; alloys of common metal; common metals and their alloys; steel building materials, namely, steel panels and cladding; steel; steel alloys; metal alloys for further manufacturing; additive alloys for the production of steel, namely, steel alloys; common metals and their alloys; stainless steelACTIVE—
007Machines for generating gas by electrolysis; industrial chemical reactors; reactors for gas-solids reactions in the nature of industrial chemical reactorsACTIVE—
011Nuclear reactors; nuclear power plants; nuclear generators; reactor vessels; steam generators; heat generating apparatus, namely, small modular nuclear reactors (SMR); steam heating apparatus; industrial heating installations, namely, small modular nuclear reactors (SMR)ACTIVE—
037Construction of nuclear reactors; construction of nuclear power plants; installation of electrical and generating machinery; renovation of nuclear plant; cleaning of nuclear plant; servicing, namely, maintenance and repair of nuclear plants; repair of energy supply installations; power infrastructure constructionACTIVE—
039Distribution of energy; distribution of renewable energy; storage of energy and fuels; electricity distribution; distribution and transmission of electricity; electricity supply and distribution; consultancy services relating to the distribution of electricity; distribution of heat.ACTIVE—
040Energy production; production of energy by nuclear power plants; generation of power; production of energy by power plants; production of electrical power from renewable sources; electricity generating; consultancy services relating to the generation of electrical power; generation of biogas.ACTIVE—
042Scientific research in the field of renewable energy; scientific research in the field of energy; research in the field of energy; research in the field of nuclear energy power generation technology; computer technology consultancy; consumer product safety testing and consultation; providing scientific information, advice and consultancy relating to net zero emissions; engineering services in the field of electrical power and natural gas production; research in the field of physics; advisory services relating to building design; research and development services in the field of engineering.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 30, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 30, 2026RFRRREFUSAL PROCESSED BY MPU—
Aug 13, 2026ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 13, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 13, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 13, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 13, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 25, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 24, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 22, 2026DOCKASSIGNED TO EXAMINER—
Jul 21, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 21, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 13, 2026LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jun 25, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance