Drawing for PLAEX

USPTO serial 79453549

PLAEX

Reviewed by CopyMark Law Group

Status 640Office Action
Filing date
Status date
Registration date
—
Examiner
THOMAS, JULIE
Law office
TMEG LAW OFFICE 107

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 640: Status 640 means the examining attorney has prepared a non-final Office Action but it has not been mailed or e-mailed yet. The action should appear in TSDR soon, and a response deadline will start once it is issued.

Need help with PLAEX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines for manufacturing construction blocks and wall panels; machines for processing recycled materials into composite building components; industrial molding machines for forming modular interlocking building blocks from recycled materials.ACTIVE—
019Building materials, namely, interlocking modular blocks, bricks, panels, wall panels, retaining wall panels, foundation blocks, landscaping edging blocks, fence panels, sheds panels, non load bearing wall panels, all made primarily of composite materials comprising recycled plastics and construction waste.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 12, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 11, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2026DOCKASSIGNED TO EXAMINER—
Jul 16, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 16, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 2, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance