USPTO serial 79453879
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemical products for sealing [leak stops]; chemical products for sealing [leak stops] for fixing refrigerant gas leaks; chemical products for sealing [leak stops] for heat pumps; chemical products for sealing [leak stops] for air conditioning and cooling systems; chemical products for sealing [leak stops] for HVAC/R systems; chemical products for sealing [leak stops] for air conditioning and cooling systems in means of transport; chemical products for sealing [leak stops] for motor vehicle air conditioning and cooling systems; chemical products for sealing [leak stops] for HVAC/R systems in civil and industrial buildings; chemical products for sealing [leak stops] for air conditioning systems in civil and industrial buildings; chemical products for sealing [leak stops] for motor vehicle air conditioning systems; chemical products for sealing [leak stops] for household and industrial refrigerators; chemical products for sealing [leak stops] for cooling installations in civil and industrial buildings. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 5, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 5, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 29, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 28, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 17, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 17, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 9, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |