Drawing for V VOLLERT PRECAST SOLUTIONS

USPTO serial 79454026

V VOLLERT PRECAST SOLUTIONS

Reviewed by CopyMark Law Group

Status 641Office Action
Filing date
Status date
Registration date
—
Examiner
ADORNO SANTOS, LUZ M.
Law office
TMO LAW OFFICE 111

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 641: Status 641 means the USPTO mailed a non-final Office Action identifying issues with your application. You typically have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.

Need help with V VOLLERT PRECAST SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines and equipment for use in the field of manufacturing prefabricated parts of concrete; parts and accessories for use in relation to the following goods: machines and equipment for use in the field of manufacturing prefabricated parts of concrete; mechanical production, heavy duty, transport, conveying, circulating and handling devices and apparatus for prefabricated concrete parts of all kinds and building elements made of concrete; mechanical production and assembly devices and apparatus, namely for use in the prefabricated concrete parts industry and for heavy and large components, principally of concrete; machines, namely manufacturing devices for brick wall manufacture; industrial robots for use in the field of manufacturing prefabricated parts of concrete.ACTIVE—
009Electrical and electronic control, regulating and inspecting apparatus and instruments; programmable logic controller (PLC); industrial computers; control units and control and observation devices (HMI), including industrial touch panels; switch gear, electrical control boards and distribution boxes (electricity); frequency inverters for electric motors and drive regulators for electric motors; industrial communications and network technology, namely gateways, industry switches, fieldbus modules and interface converters; data loggers and telemeters; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; signalling and security apparatus, namely safety light grids, security scanners, no fuse breakers; signalling and security apparatus, namely emergency stop, warning lights and signs, luminous; measuring devices, assay apparatus and detecting apparatus and instruments, namely position, distance and proximity sensors, optical sensors, laser scanners; measuring devices, assay apparatus and detecting apparatus and instruments, namely camera systems for industrial image processing; measuring devices, assay apparatus and detecting apparatus and instruments, namely 3D sensors, power and expansion sensors; measuring devices, assay apparatus and detecting apparatus and instruments, namely load cells, process humidity measuring apparatus, temperature gauges and density measuring apparatus, flow and fill level measurement apparatus; scales; material testing apparatus for industrial purposes; apparatus and instruments for recording, transmitting, processing and visualising data, sound and images, namely industrial cameras, video surveillance systems, barcode scanners, RFID readers and transponders, industrial radio modules; computers and computer peripherals; downloadable computer software for the manufacture of concrete, prefabricated concrete parts and concrete elements; recorded and downloadable computer software, namely software for installation control and installation visualisation (SCADA/HMI), process automation/MES, quality and material traceability; recorded and downloadable computer software, namely software for data recording (DAQ), energy monitoring and condition monitoring, predictive maintenance; recorded and downloadable computer software, namely software for robotic control and motion control, pallet circulation control and transport control, storage and hard chamber control; recorded and downloadable computer software, namely software for 3D layout and visualisation, digital twins and simulation of production processes; downloadable electronic manuals and instruction books relating to the aforesaid programs; all the aforesaid goods solely for use in the field of prefabricated concrete parts.ACTIVE—
037Installation, assembly and commissioning of the following goods: machines, installations and components thereof for the manufacture of prefabricated concrete parts; maintenance, servicing, retrofitting and repair of machines, installations and components thereof for the manufacture of prefabricated concrete parts; installation, assembly, maintenance and repair of the following goods: machines and installations for the manufacture of prefabricated concrete parts, in particular transporters, lifting and transport devices, safety equipment; installation, assembly, maintenance and repair of the following goods: switching and transfer systems, stacking and transfer apparatus, hardening chambers and air conditioning installations, electric switching installations.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 9, 2026RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 9, 2026RFRRREFUSAL PROCESSED BY MPU—
Aug 20, 2026CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 4, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 3, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 23, 2026DOCKASSIGNED TO EXAMINER—
Jul 16, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 16, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 9, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance