USPTO serial 79454603
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction supervision; maintenance of buildings; repair of buildings; building consultancy; maintenance and repair of installations in buildings. | ACTIVE | — |
| 042 | Consultancy services regarding engineering and technical design; technical writing; preparation of reports relating to technical research; industrial design; industrial research; drafting of technical drawings and projects for the construction sector; technical control and inspection (term considered too vague by the International Bureau pursuant to Rule 13(2)(b) of the Regulations); scientific and technological services; design and development of computer software; construction planning. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 27, 2026 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 27, 2026 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 24, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 23, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 21, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 21, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 16, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |