USPTO serial 79455390
GREENTITE
Reviewed by CopyMark Law Group
Status 640Office Action
- Filing date
- Status date
- Registration date
- —
- Examiner
- SHOOR, AMIT KUMAR
- Law office
- TMO LAW OFFICE 117
What this means
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
Need help with GREENTITE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely metal fence wire strainers; non-electric cables and wires of common metal; metal fencing materials; connecting and fastening metal devices for joining cables and wires; metal wire tighteners; tension links of metal; cable stretchers and cincture stretchers of metal (clamp links); metal fence wire tensioners; metal turnbuckles; cable clips of metal; metal connectors, metal fasteners and metal adapters, for joining, tensioning and securing wires, ropes and cables | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 2, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 1, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 24, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 21, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 21, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 21, 2026 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 30, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |