USPTO serial 79455494
Reviewed by CopyMark Law Group
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Leak testers or leak test apparatus; leak testers or leak test apparatus that utilize air pressure; leak testers or leak test apparatus that utilize hydrogen gas; leak testers or leak test apparatus that utilize helium gas; leak testers or leak test apparatus that utilize information on flow rate of compressed air; pressure gauges; pressure sensors; differential pressure sensors; pressure measuring apparatus; automatic pressure control apparatus; flow gauges; flow sensors; flow measuring apparatus; indicators that indicate pressure, flow and leakage; calibrators connected to air leak testers for generating dummy leakage of reference leakage and reference leakage flow rate; nozzle diameter measuring instruments that utilize compressed air; pressure-resistance test machines that utilize liquid pressure; measuring machines and instruments; pressure regulators, pressure controllers and flow regulators that are provided as parts or accessories of leak testers or leak test apparatus. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 2, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 1, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 27, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 12, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 12, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 6, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |