USPTO serial 79458070
NATURAIL
Reviewed by CopyMark Law Group
Status 640Office Action
- Filing date
- Status date
- Registration date
- —
- Examiner
- HUDSON, TAMARA BREE
- Law office
- TMEG LAW OFFICE 104
What this means
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
Need help with NATURAIL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Structures of metal; ducts of metal for central heating installations and for ventilating and air conditioning systems; transportable buildings of metal; valves of metal; valves of metal, other than parts of machines | ACTIVE | — |
| 009 | Heat regulating apparatus; switchgear [electric]; boiler control instruments; temperature indicating apparatus; temperature controlling apparatus; electronic controllers, software and electric sensors for heating, ventilating, air conditioning and air purification equipment; aforesaid goods particularly for rail, industrial, mining, or defense vehicles; parts of the aforesaid goods | ACTIVE | — |
| 011 | Heating, ventilating and air conditioning and purification equipment (ambient); air cleaning apparatus; heating installations; heat pumps; defrosters; heat exchangers, other than parts of machines; aforesaid goods particularly for rail, industrial, mining, or defense vehicles; parts of the foregoing | ACTIVE | — |
| 037 | Installation, maintenance and repair of heating, ventilating, air-conditioning and air purification equipment and installations, apparatus for the treatment of air, heating elements, heat pumps, heat exchangers, heat regulating apparatus, switching installations, boiler control instruments, temperature indicators, thermostats, electronic controllers, electric sensors for heating, ventilating, air-conditioning and air purification equipment and installations, and parts of the aforesaid goods, in particular for railway, industrial, mining, defense vehicles; installation services relating to the modernization of heating, ventilating, air-conditioning and air purification equipment and installations, apparatus for the treatment of air, heating elements, heat pumps, heat exchangers, heat regulating apparatus, switching installations, boiler control instruments, temperature indicators, thermostats, electronic controllers, electric sensors for heating, ventilating, air-conditioning and air purification equipment and installations, and parts of the aforesaid goods, in particular for railway, industrial, mining, defense vehicles | ACTIVE | — |
| 042 | Science and technology services; scientific and industrial research; engineering research; engineering services; engineering services relating to information technology; preparation of data processing programmes; engineering consultancy services; creating, maintaining and updating computer software | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Knorr-Bremse Aktiengesellschaft
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named NATURAIL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 14, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 13, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 6, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 11, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 11, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 10, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |