Status 640Office Action
Filing date
Status date
Registration date
—
Examiner
SUK, HAE P
Law office
TMEG LAW OFFICE 107

What this means

The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.

Status 640: Status 640 means the examining attorney has prepared a non-final Office Action but it has not been mailed or e-mailed yet. The action should appear in TSDR soon, and a response deadline will start once it is issued.

Need help with ENNOVA GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Ignition coils [parts of machines]; motors; electric drive motors for machines and parts therefor; control mechanisms for machines and motors; power generation machines; electricity generators; generators [machines]; expansion tanks [parts of machines]; alternators; dynamos; electric motors [other than for land vehicles]; housings [parts of machines]; brushes [parts of machines]ACTIVE—
009Apparatus, instruments and cables for electricity; electrical reactors; electrical adapters; monitoring apparatus [other than for medical purposes]; measuring devices, electric; reactors for commutation; distribution boxes [electricity]; current rectifiers; inverters (electrical); cables, electric; holders for electric coils; choking coils; electric coils; solenoid valves [electromagnetic switches]; wire connectors [electricity]; collectors, electric; commutators; capacitors; contacts, electric; branch boxes [electricity]; junction boxes [electricity]; connectors [electricity]; electrical conduit; terminals [electricity]; grounding apparatus; sheaths for electric cables; limiters [electricity]; circuit breakers; switches; fuses; converters, electric; electronic inverters, controllers and regulating apparatus; magnetic wires; conductors, electric; wires, electric; distribution consoles [electricity]; control panels [electricity]; relays, electric; inductors [electricity]; connections for electric lines; connectors [electricity]; resistances, electric; transformers [electricity]; step-up transformers; electric current transformers; electric loss indicators; anti-interference devices [electricity]; distribution boards [electricity]; apparatus to check electrical circuits; armatures [electricity]ACTIVE—
037Installation of grounding systems; installation of electrical devices; machinery installation, maintenance and repair; installation and assembly services relating to the electrical power stations, substations and energy devices; cleaning, maintenance and repair of electrical stations, substations and energy devicesACTIVE—
042Engineering in the field of transformers, voltage regulation and electrical devices; electrical system design for transformers and power equipment; research and development of new products in the field of transformers, tap changers, voltage regulation and electrical engineering; technical consultations in the field of designing machines for the production of electronic circuits; designing industrial equipment in the field of transformers, voltage regulation, power equipment and electrical engineering; technical studies in the field of transformers, voltage regulation, power equipment and electrical engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 30, 2026RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 29, 2026CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2026DOCKASSIGNED TO EXAMINER—
Sep 11, 2026MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 11, 2026NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 10, 2026REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—