USPTO serial 79458542
SUNTERRA
Reviewed by CopyMark Law Group
Status 640Office Action
- Filing date
- Status date
- Registration date
- —
- Examiner
- REED, NATASHA DEMETRIA
- Law office
- TMO LAW OFFICE 138
What this means
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
Need help with SUNTERRA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electricity generating solar cells and panels; solar batteries; solar batteries for domestic use; solar batteries for industrial use; solar cells for electricity generation; solar collectors for electricity generation; solar energy collectors for electricity generation; solar energy operating apparatus; solar panels for electricity generation; solar panels for the production of electricity; inverters (electricity); electrical distribution apparatus; electrical power distribution apparatus; electrical cabling; plastic conduits for electrical wiring; electrical components; electrical switches; electrical cables; electrical distribution boxes; electrical inverters. | ACTIVE | — |
| 011 | Solar collectors (heating); solar collectors (lighting); solar collectors for heating; solar energy collectors for heating; solar heating installations; solar heating panels; solar lamp units; solar lamps; solar panels for use in heating. | ACTIVE | — |
| 037 | Installation of solar energy systems; electrical installation services; electrical engineering services (construction); electrical wiring services. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 19, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 6, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 17, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 17, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 17, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |