USPTO serial 79459651
POWERTITAN E3
Reviewed by CopyMark Law Group
Status 640Office Action
- Filing date
- Status date
- Registration date
- —
- Examiner
- ADEJUNMOBI, AKIN T
- Law office
- TMEG LAW OFFICE 105
What this means
The USPTO has issued an Office Action on this application. A response is typically required before the deadline, or the application can be abandoned.
Need help with POWERTITAN E3?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Office Action, set up monitoring, or talk with CopyMark.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Operating system program; supercapacitors for energy storage; converters, electric; power converters; resistances, electric; voltage monitoring modules; integrated circuit module; uninterruptible power supply apparatus [battery]; current rectifiers; distribution boxes [electricity]; sensor; transformers [electricity]; inverters [electricity]; electric apparatus for commutation; electric control equipment for energy control; automation systems for power stations; batteries, electric; battery pack; photovoltaic devices and equipment for solar power generation | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 7, 2026 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 6, 2026 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2026 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 1, 2026 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 1, 2026 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 1, 2026 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |