Drawing for BOUSTEAD

USPTO serial 79975621

BOUSTEAD

Reviewed by CopyMark Law Group

Reg. 6823353Status 700Registered
Filing date
Status date
Registration date
Aug 23, 2022
Examiner
MESSICK, TABITHA LEE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BOUSTEAD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul L. Havel

Paul L. Havel Miller Nash LLPSte 3400111 SW Fifth Avenue, Suite 3400Portland, OR 97204

Goods and services

ClassDescriptionStatusFirst use
007Waste heat recovery machines; hydraulic controls for machines, motors and engines; power driven mechanical controls for machines for start-up, operation, and shutdown of oil and gas production processes, other than for vehicles; pneumatic controls for machines, motors and engines; hydraulic power transmission units for machines, other than for land vehiclesACTIVE—
009Computer controlled electronic apparatus for process control; electrical control panels for fire alarm systems; electronic control systems for oil and gas production systems; downloadable industrial process control software; computer software products in the nature of downloadable software for use in geographic information systems and smart mapping analysis, data processing and management, and collaboration; downloadable software and applications for mobile devices for use in geographic information systems and smart mapping analysis, data processing and management, and collaboration; computer digital maps being downloadable maps; downloadable software that creates smart maps and digital maps; digitized land maps being downloadable mapsACTIVE—
010Apparatus for medical rehabilitation, namely body rehabilitation equipment to regain mobility post-stroke or sports injuryACTIVE—
011Air reheaters; convection heaters; gas fired industrial heater for oil and gas refining production systems; industrial heaters, namely, gas fired industrial direct-fired process heater systems comprised of heating units for industrial purposes; oil fired industrial heaters; oil-fired, direct-fired process heaters for oil and gas refining processes; oil pre-heaters for industrial processes; oil pre-heaters for oil and gas refining processes; electric radiant heaters; air heating furnaces; gas fired furnaces; gas generating furnaces; industrial heating furnaces; reheating furnaces for industrial purposes; heat transfer apparatus, other than parts of machines; air heat recovery installations; heat recovery apparatus, other than parts of machines; space heating apparatus, namely, machines for the recovery of heatACTIVE—
037Advisory services relating to the construction of civil engineering structures; advisory services relating to the construction of mechanical engineering structures; advisory services relating to the repair of civil engineering structures; advisory services relating to the repair of mechanical engineering structures; civil engineering structures construction; construction of mechanical engineering structures; construction services for mechanical and engineering structures; construction of structural engineering structures; construction services for structural engineering structures; installation of industrial furnaces; repair or maintenance of industrial furnaces; repair of heat recovery apparatus; building construction services; construction project management services in the field of residential buildings; construction project management services in the field of industrial buildings; custom building construction; real estate developmentACTIVE—
042Architectural and engineering services; building and structural inspection services for quality control; civil engineering; computer-aided engineering design and drawing services; conducting of engineering feasibility studies; design services relating to civil engineering; engineering; engineering design services; engineering drawing services; engineering services, namely, providing engineering feasibility studies; engineering project management services; engineering services; testing on civil, mechanical and electrical engineering; industrial engineering design services; mechanical engineering; plant engineering; structural engineering services; technical consulting in the field of environmental engineering; engineering services, namely, technical project planning in the field of engineering; engineering services, namely, technical project planning in the field of civil, mechanical and electrical engineering; design of exterior environmental settings, namely, designing and planning of real estate subdivisions and developments; designing and planning of industrial real estate subdivisions and developments; consultancy and information services relating to information technology; computer software advisory services; computer software consultancy; computer software development; computer software installation and maintenance; computer software technical support services, namely trouble shooting in the nature of diagnosing computer software programs; design and development of computer software for process control; design and development of computer software for use with medical technology; design, maintenance, development and updating of computer software; design and development of computer software applications for geographic information systems and smart mapping analysis, data processing and management, and collaboration; software as a service (saas) featuring software for use in geographic information systems and smart mapping analysis, data processing and management, and collaboration; Mapping services, namely, location of utility lines; mapping services, namely, location of infrastructure and utilities; mapping services; architectural services for the design of buildings; engineering and industrial design, namely, building design services; computer aided engineering design services relating to building projectsACTIVE—
044Medical and healthcare services; providing physical rehabilitation facilities; physical rehabilitation servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 23, 2023FINPFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 20, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 16, 2023XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Mar 16, 2023XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 28, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 7, 2022FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 7, 2022FIMPFINAL DISPOSITION PROCESSED—
Nov 23, 2022FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 11, 2022OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 23, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 23, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 7, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 7, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 18, 2022OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 18, 2022OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 18, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 29, 2022FIXDELECTRONIC RECORD REVIEW COMPLETE—
Apr 1, 2022ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Mar 26, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 25, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Mar 25, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 25, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 25, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 1, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 1, 2022ALIEASSIGNED TO LIE—
Feb 28, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 28, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 9, 2022ATRVATTORNEY REVIEW COMPLETED—
Feb 4, 2022MNDANOTICE OF DIVIDED TRADEMARK APPLICATION MAILED—
Jan 31, 2022DPCCDIVISIONAL PROCESSING COMPLETE—
Jan 31, 2022AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 20, 2021DRRRDIVISIONAL REQUEST RECEIVED—
Dec 20, 2021ERTDTEAS REQUEST TO DIVIDE RECEIVED—
Dec 17, 2021ERTDTEAS REQUEST TO DIVIDE RECEIVED—
Sep 20, 2021RFNTREFUSAL PROCESSED BY IB—
Aug 31, 2021RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 31, 2021RFRRREFUSAL PROCESSED BY MPU—
Aug 19, 2021RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 18, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2021DOCKASSIGNED TO EXAMINER—
Mar 26, 2021MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 22, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 18, 2021REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance