Drawing for SEKISUI

USPTO serial 85024419

SEKISUI

Reviewed by CopyMark Law Group

Reg. 4130415Status 710
Filing date
Status date
Registration date
Apr 24, 2012
Examiner
CARROLL, DORITT
Law office
TMO LAW OFFICE 116

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with SEKISUI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Victoria Friedman

Victoria Friedman Dennemeyer & Associates, LLC2 North Riverside PlazaSuite 1500Chicago, IL 60606

Goods and services

ClassDescriptionStatusFirst use
006[ Irons and steels; metal building materials, namely, soffits metal joinery fittings; metal safes; metal hardware, namely, pulleys and washers; kits for making prefabricated buildings substantially of metal comprised of ceiling supports of metal, metal door frames, metal poles, and metal roofing; metal fluid storage tanks and reservoirs; metal fluid storage tanks for industrial use; metal fluid storage tanks for holding liquefied gas; internal floating lids of aluminum for use with gas or liquefied gas storage tanks; manually operated metal valves; loading and unloading pallets of metal; metal turn-tables for load handling; metal traversers for load handling; transportable greenhouses of metal for household use; road signs of metal not luminous or mechanical; metal junctions for pipes; metal flanges; water tanks of metal for household purposes; metal stepladders and ladders; crampons for climbing; metal hardware, namely, carabiners of metal; pitons of metal; diving platforms of metal ]SECTION 8 - CANCELLED
017[ Valves of rubber or vulcanized fiber ]SECTION 8 - CANCELLED
019Ceramic and porcelain building materials, namely, ceramic drain pipes, ceramic enamel tiles, ceramic roofing tiles, ceramic shapes for use in refractory furnaces, ceramic tiles for flooring, lining, facing, coverings, wall and ceiling, and glazed ceramic tiles; bricks and refractory construction materials not of metal; non-woven textiles made of synthetic fibers for use in the building industry; asphalt-based mastics for the foundation of buildings; rubber building or construction materials, namely, tiles for use on indoor and outdoor floors; plaster for building purposes; hydrated lime for building purposes; building or construction materials of plaster, namely, plaster boards; kits for making prefabricated building not of metal, comprised of beams, boards, floors, and door frames; cement and its products, namely, cement aggregates; building timber; building stone; building glass; non-metal joinery fittings; construction materials, namely, fiberglass boards; plaster boards; tar and pitches; prefabricated greenhouses not of metal for household use; artificial fish reefs not of metal; erosion control fabric, mats, and sheeting not of metal; non-luminous road signs not of metal; water tanks of masonry for household purposes; diving platforms not of metalSECTION 8 - CANCELLED
036Loan financing; financial guarantee and surety services; commercial lending; acquisition and transfer of monetary claims; life insurance brokerage; agencies for non-life insurance; claim adjustment for non-life insurance; insurance premium rate computing; management of buildings; agencies or brokerage for renting of buildings; leasing or renting of buildings; purchase and sale of buildings; agencies or brokerage for purchase and sale of buildings; real estate appraisal; real estate management of commercial and residential real estate; agencies or brokerage for leasing or renting of land; leasing of land; real estate agency services; agencies or brokerage for purchase or sales of land; providing information in the field of real estateSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 10, 2023NCS8NOTICE OF CANCELLATION SEC. 8 EMAILED
Jun 9, 2023C8.TCANCELLED SEC. 8 (10-YR)
Nov 14, 2022PUM2OFFICE ACTION ISSUED POU2
Nov 9, 2022EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
May 9, 2022PUM1OFFICE ACTION ISSUED POU1
May 8, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 14, 2022E89RTEAS SECTION 8 & 9 RECEIVED
Apr 24, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
May 4, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
May 4, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
May 4, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 24, 2018E815TEAS SECTION 8 & 15 RECEIVED
Apr 24, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Apr 24, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 20, 2012DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION
Mar 20, 2012IUCNNOTICE OF ALLOWANCE CANCELLED
Feb 29, 201244EM44(e) PETITION - DISMISSED
Feb 28, 2012PCDEPETITION TO DIRECTOR DENIED
Feb 28, 2012APETASSIGNED TO PETITION STAFF
Feb 28, 2012TPADTEAS PETITION TO AMEND BASIS RECEIVED
Dec 13, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 18, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 18, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 13, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Sep 6, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 6, 2011XAECEXAMINER'S AMENDMENT ENTERED
Sep 6, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Sep 6, 2011GNEAEXAMINERS AMENDMENT E-MAILED
Sep 6, 2011CNEAEXAMINERS AMENDMENT -WRITTEN
Mar 7, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Mar 7, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 7, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 9, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 9, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 8, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 11, 2010CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED
Aug 10, 2010ALIEASSIGNED TO LIE
Aug 10, 2010GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
Aug 10, 2010GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
Aug 10, 2010CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED
Aug 6, 2010DOCKASSIGNED TO EXAMINER
Apr 30, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 30, 2010NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance