USPTO serial 85031787
CONSTRUCTION RISK MANAGEMENT
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- BLOHM, LINDA
- Law office
- TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with CONSTRUCTION RISK MANAGEMENT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building inspection; Charitable services, namely, renovating and constructing homes for low income families; Constructing decks; Construction and construction management of tunnels and underground structures; Construction and renovation of buildings; Construction and repair of buildings; Construction and repair of movie and theatrical sets and scenery; Construction consultancy; Construction consultation; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; Construction grading services; Construction management; Construction of airports; Construction of aquatics facilities; Construction of buildings; Construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; Construction of medical establishments; Construction of roads, underground utilities, and housing pads; Construction of telecommunication towers; Construction planning; Construction project management services; Construction project management services in the field of construction of offshore oil and gas facilities; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consultation in the field of construction and building of horse-riding arenas; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Consulting in the field of hospital construction; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Consulting services in the field of construction of wind energy facilities; Consulting services in the field of offshore oil and gas facility construction; Custom construction and building renovation; Custom construction of homes; Factory construction; General construction contracting; Harbor construction; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Hydro-electric factory construction; Laying and construction of pipelines; Marine construction; Pier construction; Pipeline construction and maintenance; Real estate development and construction of commercial, residential and hotel property; Residential and building construction consulting; Residential and commercial building construction; Road construction; Steel structure construction works; Street construction; Technical consultation in the field of building construction; Underwater building and construction; Warehouse construction and repair | ACTIVE | Dec 1, 2008 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 18, 2011 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jan 18, 2011 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 9, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 7, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| May 12, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 10, 2010 | NWAP | NEW APPLICATION ENTERED | — |