Drawing for THERMA

USPTO serial 85080324

THERMA

Reviewed by CopyMark Law Group

Reg. 4123854Status 800Registered
Filing date
Status date
Registration date
Apr 10, 2012
Examiner
KEAM, ALEX S
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with THERMA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Daniel L. Moffett

Daniel L. Moffett AKIN GUMP STRAUSS HAUER & FELD LLP112 E Pecan St Ste 1010San Antonio, TX 78205UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Cladding of metal for construction and building; metal tubing; ducts and pipes of metal for central heating installations; elbows of metal for pipes; metal pipes; metal junctions for pipes; metal pipe clips, collars, connectors, couplings, joints, and fittings; metal storage tanks; pressure vessels made of metal alloys, namely, pressurized metal fluid storage tanks, pressurized metal gas storage tanks; roof guards made of metalACTIVEJan 1, 1984
011HVAC unitsACTIVEJan 1, 1984
037Building construction, remodeling, and repair; construction consultation; construction of clean rooms; construction planning; construction project management services; construction supervision; laying and construction of pipelines; pipeline construction and maintenance; general contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, foundation, building, mechanical, paving, plastering, and framing contractor services; installation, repair, and maintenance of plumbing; HVAC contractor services; Inspection services in the course of construction of buildings, clean rooms, plumbing, and ventilation systems; polishing of metal pipes and tubingACTIVEJan 1, 1984
040Custom manufacturing in the field of sheet metal shaping, cutting, and fabrication; custom manufacture of steel pipe and tubing; custom manufacture of framing, piping, and support structures for industrial equipment systemsACTIVEJan 1, 1984
042Architectural and engineering services; consulting in the fields of engineering and architecture; custom design and engineering of clean rooms, HVAC systems, and plumbing systems; inspections of plumbing and ventilation systems; testing and inspection of clean rooms of others for certification purposes; inspecting and testing of welding of others for certification purposes; purge gas monitoringACTIVEJan 1, 1984

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 26, 2022NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED
Aug 26, 2022RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 26, 202289AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Aug 26, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 8, 2022E89RTEAS SECTION 8 & 9 RECEIVED
Apr 10, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
Apr 22, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
Apr 22, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
Apr 20, 2018EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Apr 20, 2018PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15
Apr 20, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 11, 2018ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Apr 10, 2018E815TEAS SECTION 8 & 15 RECEIVED
Apr 10, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Apr 10, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 24, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 24, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 4, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 19, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 19, 2011ALIEASSIGNED TO LIE
Nov 29, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 19, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 18, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 18, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Nov 17, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 19, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
May 19, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 19, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 28, 2011XAECEXAMINER'S AMENDMENT ENTERED
Apr 28, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Apr 28, 2011GNEAEXAMINERS AMENDMENT E-MAILED
Apr 28, 2011CNEAEXAMINERS AMENDMENT -WRITTEN
Apr 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 21, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 21, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 6, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Oct 21, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 21, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 20, 2010DOCKASSIGNED TO EXAMINER
Jul 12, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 12, 2010NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance