Drawing for HDE

USPTO serial 85082489

HDE

Reviewed by CopyMark Law Group

Reg. 4218352Status 800Registered
Filing date
Status date
Registration date
Oct 2, 2012
Examiner
KERTGATE, AMY L
Law office
TMO LAW OFFICE 113

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with HDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph M. Lafata

Joseph M. Lafata Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098

Goods and services

ClassDescriptionStatusFirst use
009Electrical test, measurement, and safety equipment, namely, voltmeters, phasing sets for determining phasing of conductors in power distribution and transmission applications, power testers, surge arrester testers, voltage leakage testers, transformer testers, capacitor testers, voltage detectors, ammeters, phase rotation meters, electrical load testers, voltage testers, continuity testers, capacitor controls, [ electronic recorders for recording data relating to power distribution, ] electrical power extension cords, cable fault testers, insulated hot stick poles for use on electric power lines, voltmeter proof testers for confirming proper operation of a voltmeter, phaser proof testers for confirming proper operation of phasers in power distribution and transmission applications, cable phase identifiers for determining proper cable phasing in power distribution applications, voltage indicators, power line insulator testers, dielectric integrity testers for ropes, slings, and straps, ammeter recorders, current recorders, and voltage level recorders; measuring apparatus, namely, meters for measuring cable sag, cable height distance, and overhead clearance; helmet safety lights, namely, hard hat lightsACTIVEAug 31, 2010
011[ Spot lights; flood lights ]SECTION 8 - CANCELLEDJul 27, 2012
035[ Wholesale distributorship services in the field of electric utility products ]SECTION 8 - CANCELLEDApr 14, 2010
040[ Utility related services, namely, custom machining and fabrication of electric utility products ]SECTION 8 - CANCELLEDJul 27, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 11, 2023NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Apr 11, 2023RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Apr 11, 20239G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8—
Apr 11, 20238PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED—
Apr 11, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 30, 2022E89RTEAS SECTION 8 & 9 RECEIVED—
Oct 2, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 10, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 10, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 10, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 27, 2018E815TEAS SECTION 8 & 15 RECEIVED—
Oct 2, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 1, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 1, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 2, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 30, 2012SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED—
Aug 29, 2012REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Aug 29, 2012CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Aug 16, 2012SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Aug 16, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jul 30, 2012IUAFUSE AMENDMENT FILED—
Jul 30, 2012EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jan 31, 2012NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 6, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 16, 2011NPUBNOTICE OF PUBLICATION—
Oct 28, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 27, 2011CNEAEXAMINERS AMENDMENT MAILED—
Oct 26, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 26, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Oct 26, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 19, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 19, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 10, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 11, 2011CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 11, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 22, 2011ALIEASSIGNED TO LIE—
Mar 10, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 13, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 9, 2010DOCKASSIGNED TO EXAMINER—
Jul 16, 2010MPMKNOTICE OF PSEUDO MARK MAILED—
Jul 15, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 15, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance