USPTO serial 85094674
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Trudie Katz Walker
TRUDIE KATZ WALKER TRUDIE KATZ WALLKER225 OLD COUNTRY RDMELVILLE, NY 11747-2719UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Cast iron and fabricated steel building products, namely, manhole covers and frames, catch basin frames and grates, storm drain gutter inlets, storm drain gutter inlet frames, storm drain gutter inlet hoods, storm drain curb inlets, storm drain curb inlet frames, storm drain curb inlet hoods, sewer grates, ditch bottom grates, catch basin grates, hand hole frames, hand hole covers, cleanout frames and covers, vault covers, inspection hatches, access hatches, property line box covers, distribution box covers, splice box covers, pull box covers, junction boxes, watertight covers for utility vaults and inspection chambers, locking frames and covers for utility hand holes and distribution boxes and property line boxes, lab type frames covers and grates for retention chambers, inlet frames with stream flow for storm water and sanitary sewer systems, oval hole type or bicycle grates for storm water, catch basin and manhole openings, monument box inspection and access frames and covers, round, square and rectangular frames and covers or grates for Department of Transportation pull boxes and splice boxes, extension rings for cesspools, septic tanks and manholes, fabricated steel grates for drainage structures, parallel bar grates for, catch basins, bike safe grates for catch basins, inlet risers, namely, manhole risers, trash racks, pervious concrete tree grates, castings frame covers grates | SECTION 8 - CANCELLED | Dec 31, 1992 |
| 009 | Conduits for electrical distribution systems | SECTION 8 - CANCELLED | Dec 31, 1948 |
| 019 | Building materials, namely, pre-cast concrete manholes, junction boxes, splice boxes, property line boxes, and distribution boxes, temporary concrete barrier systems, namely, portable, free-standing barriers, crash barriers for traffic and crowd control, light pole foundations, transformer pads, caps, mats and slabs, reef balls for artificial reef building, vaults and catch basins for storm water and sanitary sewer systems, and manholes | SECTION 8 - CANCELLED | Dec 31, 1948 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 31, 2023 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Sep 18, 2021 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jun 27, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 27, 2018 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jun 27, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 15, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 18, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Sep 18, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 3, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 3, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 13, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 29, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 17, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 26, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 25, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 25, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 23, 2012 | CEPE | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED | — |
| Apr 20, 2012 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 20, 2012 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Apr 20, 2012 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Mar 21, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 21, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 21, 2012 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Dec 21, 2011 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Dec 21, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jun 21, 2011 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 21, 2011 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 21, 2011 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 17, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 17, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 19, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 19, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 19, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 11, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 2, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 31, 2010 | NWAP | NEW APPLICATION ENTERED | — |