Drawing for JX NIPPON OIL & GAS EXPLORATION

USPTO serial 85096635

JX NIPPON OIL & GAS EXPLORATION

Reviewed by CopyMark Law Group

Reg. 4051654Status 800Registered
Filing date
Status date
Registration date
Nov 8, 2011
Examiner
EDWARDS, ALICIA COLLINS
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with JX NIPPON OIL & GAS EXPLORATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

N. Alexander Nolte

N. Alexander Nolte Nolte Lackenbach Siegel1 Chase RoadSCARSDALE, NY 10583UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042[Research in the field of scientific technology and provision of scientific technology information; design of air conditioning systems; design of machines and apparatus in the fields of refining, processing, developing or manufacturing oil, earth resources, energy or industrial materials; inspection of automobiles for automobile safety inspection; research on soil pollution; design and engineering of plants, namely, engineering services in the nature of design and development of LP gas plants, pharmaceutical manufacturing plants and nuclear power plants, engineering services in the nature of design and development of refinery plants of oil, natural gas and minerals, engineering services in the nature of design and development of refinery plants of non-ferrous metals, engineering services in the nature of design and development of electric power plants and the related facilities; design of oil refining apparatus; engineering of oil refining apparatus; agencies for inspection of automobiles and application for automobile safety inspection, namely, automobile inspection services for environment protection and automobile safety; chemical analysis of petroleum products; chemical analysis of metals; scientific research, exploration and development of new technology for others in the fields of petroleum oil and natural gas resources; scientific research, development of new technology for others, testing and analysis relating to manufacturing, processing and using of petroleum products and raw materials thereof; providing meteorological information; architectural design; surveying; ]geological surveys or research[; designing of machines, apparatus, instruments or systems composed of such machines, apparatus and instruments in the fields of refining, processing, developing or manufacturing oil, earth resources, energy or industrial materials; computer software design, computer programming, or maintenance of computer software; technical advice services relating to performance and operation of computers and automobiles; testing, inspection or research of pharmaceuticals, cosmetics or foodstuff; research on building construction or city planning; testing or research on prevention of pollution; testing or research on electricity; testing or research on civil engineering; testing, inspection or research on agriculture, livestock breeding or fisheries; testing or research on machines, apparatus and instruments; rental of measuring apparatus; rental of computers; providing computer programs, namely, providing on-line non-downloadable software for use in database management; rental of laboratory apparatus and instruments; rental of drawing instruments for engineering and architectural drawings; smog testing of motor vehicles; providing information relating to smog testing of motor vehicles]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 28, 2022NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 28, 2022RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 28, 202289AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 28, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 3, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Sep 29, 2021ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 8, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
May 9, 2018ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jan 9, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jan 9, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 28, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 16, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 8, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Nov 8, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Nov 8, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 29, 2011DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Sep 29, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 27, 2011IUCNNOTICE OF ALLOWANCE CANCELLED—
Sep 27, 2011EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Sep 27, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 2, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 2, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 24, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 21, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 27, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 27, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 20, 2011ALIEASSIGNED TO LIE—
May 14, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 16, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2010DOCKASSIGNED TO EXAMINER—
Aug 4, 2010MPMKNOTICE OF PSEUDO MARK MAILED—
Aug 3, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 3, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance