Drawing for ELIIY POWER

USPTO serial 85112871

ELIIY POWER

Reviewed by CopyMark Law Group

Reg. 4188739Status 710
Filing date
Status date
Registration date
Aug 14, 2012
Examiner
CARLSON, KRISTIN
Law office
—

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ELIIY POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Scott S. Havlick

SCOTT S. HAVLICK HOLLAND & HART LLPP.O. Box 8749Attn: Trademark DocketingDENVER, CO 80201

Goods and services

ClassDescriptionStatusFirst use
007[ Industrial robots for transmission, namely, for use on automobile transmissions and for transmission of electricity; loading-unloading machines and apparatus; power-generating machines and apparatus, namely, wind turbines; machines and apparatus for hydraulic power generation, namely, hydraulic turbines; machines and apparatus for geothermal power generation, namely, geothermal electric power generators; power-generating machines and apparatus driven by exhaust heat, namely, generators of electricity driven by exhaust heat ]SECTION 8 - CANCELLED—
009[ Transportable power-supply machines and apparatus, namely, electrical power supplies, electrical storage batteries, charge controllers and inverters, power distributing boxes and power cables; power-supply machines and apparatus, namely, electrical power supplies, electrical storage batteries, charge controllers and inverters, power distributing boxes and power cables; transportable condensers; transportable electrical power units, namely, charge controllers, electrical storage batteries and inverters permitting the acquisition of electrical power from various sources, storage of electrical power and the distribution of electrical power as available and needed; emergency power-supply machines and apparatus, namely, charge controllers, electrical power batteries and inverters permitting the acquisition of electrical power from various sources, storage of electrical power and the distribution of electrical power as available and needed; emergency electrical power generation and storage units, namely, charge controllers, electrical storage batteries and inverters permitting the acquisition of electrical power from various sources, storage of electrical power and the distribution of electrical power as available and needed; electrical power storage and distribution units, namely, charge controllers, electrical power batteries and inverters; solar batteries; machines and apparatus for solar photovoltaic power generation, namely, photovoltaic systems that convert sunlight into electric and thermal energy, photovoltaic cells, photovoltaic cells also including a solar thermal collector sold as a unit; machines and apparatus for solar thermal power generation, namely, solar thermal electrical generation systems that convert sunlight into thermal energy and electricity, solar thermal cells also including a solar thermal collector sold as a unit, installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; ] lithium-ion batteries; secondary batteries; lithium-ion secondary batteries; [ lithium-ion polymer rechargeable batteries; ] batteries; storage batteries [ ; telecommunication machines and apparatus, namely, digital telephones, mobile telephones, satellite transmitters and receivers; electronic machines, apparatus and their parts, namely, computer hardware and computer peripherals; power distribution or control machines and apparatus, namely, power controllers, distribution transformers and power distributing boxes; measuring or testing machines and instruments, namely, coordinate measuring machines, level measuring machines, metal strength testing machines and machines for testing integrated circuits; electric power storage systems, namely, charge controllers, electrical storage batteries and electrical power distribution units; electric vehicle charging stations; movable electric power storage systems, namely, charge controllers, electrical storage batteries and electrical power distribution units ]SECTION 8 - CANCELLED—
012[ Electric vehicles, namely, electric cars; automobiles; motorized land vehicles; bicycles; forklift trucks; motorized golf carts ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 24, 2023CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Aug 14, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 25, 2018NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Jul 25, 20188.PRREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED—
Jul 25, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 22, 2018ES8RTEAS SECTION 8 RECEIVED—
Aug 14, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 14, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 29, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 29, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 9, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 24, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 24, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 3, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 3, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 27, 2012ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Dec 13, 2011GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Dec 13, 2011GNSLLETTER OF SUSPENSION E-MAILED—
Dec 13, 2011CNSLSUSPENSION LETTER WRITTEN—
Dec 8, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 8, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 8, 2011ALIEASSIGNED TO LIE—
Nov 21, 2011ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 27, 2011GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 27, 2011GNSLLETTER OF SUSPENSION E-MAILED—
Jun 27, 2011CNSLSUSPENSION LETTER WRITTEN—
Jun 9, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 9, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 9, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 6, 2010DOCKASSIGNED TO EXAMINER—
Aug 26, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 25, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance