Drawing for NORTHERN POWER

USPTO serial 85149531

NORTHERN POWER

Reviewed by CopyMark Law Group

Reg. 4088811Status 710
Filing date
Status date
Registration date
Jan 17, 2012
Examiner
SALEMI, DOMINICK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with NORTHERN POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence H. Meier

LAWRENCE H. MEIER DOWNS RACHLIN MARTIN PLLC199 MAIN STBURLINGTON, VT 05401-8339UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Electricity generators, namely, renewable energy-powered electricity generators and wind-powered electricity generatorsSECTION 8 - CANCELLEDNov 14, 2011
009Power inverters, AC-DC converters, AC-DC-AC converters, DC-AC converters; Power controllers; Wind turbine controllers, namely, electronic control systems that control the voltage and current provided from wind turbines to other connected devices and to electrical transmission and distribution systems, the rotational speed of a wind turbines, the power output of wind turbines, and the startup, shutdown, protection, monitoring, and safety operations of wind turbines; Electronic control systems for renewable and fuel-based energy generation sources comprising hardware and software that control the voltage and current provided from a renewable or nonrenewable energy generation source to other connected devices, the power output of an energy generation source, and the startup and shutdown operations of an energy generation source; Electronic controllers for use with power converters and power inverters, namely, electronic controllers to manage the speed, power, movement and functions of power converters and power inverters used in conjunction with renewable and fuel-based energy generation sources, wind turbines, wind-powered electricity generators, energy storage systems, electrical distribution systems, microgrid systems, and load control devices; Wind turbine control systems comprising electronic sensors, namely, rotational speed sensors, wind speed sensors, temperature sensors, pressure sensors, vibration and acceleration sensors, angular position sensors, and air density sensors, and related software to manage the power, movement and functions of wind turbines; Computer hardware and computer software for use in controlling and monitoring the operation of equipment that consumes or generates power; Automated process control systems, namely, micro-processor based hardware and software used to monitor and control the operational and mechanical status of wind turbines, renewable energy-powered electricity generators, wind-powered electricity generators, fuel-based electrical generators, energy storage systems, and load control systemsSECTION 8 - CANCELLEDNov 14, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 24, 2018C8..CANCELLED SEC. 8 (6-YR)—
Jan 17, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 17, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 10, 2011SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Dec 9, 2011REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Dec 9, 2011CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Dec 1, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 30, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2011CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2011SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 30, 2011EX1GSOU EXTENSION 1 GRANTED—
Nov 28, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Nov 17, 2011IUAFUSE AMENDMENT FILED—
Nov 17, 2011EXT1SOU EXTENSION 1 FILED—
Nov 17, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 17, 2011EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
May 17, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 22, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 22, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 15, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 15, 2011ALIEASSIGNED TO LIE—
Jan 21, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 21, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jan 21, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 21, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 21, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 20, 2011DOCKASSIGNED TO EXAMINER—
Oct 14, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 14, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance