USPTO serial 85155866
FORWARD. TOGETHER.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 23, 2013
- Examiner
- HOFFMAN, DAVID AARON
- Law office
- —
What this means
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
Need help with FORWARD. TOGETHER.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Vancouver, B.C., CA
Vancouver, B.C., CA
Vancouver, B.C., CA
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alexis P. Grilli
Alexis P. Grilli Nixon Peabody LLP799 9th Street, NW, Suite 500Washington, DC 20001United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | [Construction of high rise condominiums, industrial buildings, office buildings, retail buildings, mixed office, retail and/or residential buildings,] construction and installation project management, namely, carrying out and management of the carrying out of roads, road paving, gravel crushing projects, earth moving projects, mining projects, wind power projects, [industrial buildings, commercial buildings, high rise residential buildings, office buildings, retail buildings, mixed office buildings, retail and residential buildings,] power plants and power facilities, [processing plants, industrial plants,] underground piping for water, utilities, [hydrocarbons] and sewers, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics projects, cable data transmission projects, laying and installation of wire and cable for Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems, mining projects, reclamation projects and mined material processing facilities; [construction an] installation project management for [buildings], [industrial plants, road building, road paving, earth moving, mining,] data (voice, Internet and video) transmission, [pipeline, water treatment facilities, aqueduct and other municipal facilities,] and equipment rigging and lifting in relation to construction and installation of the above projects, equipment and facility transportation in relation to the above projects, repair, electronic repair and emergency restoration and maintenance of telephony and voice systems | ACTIVE | Jun 30, 2012 |
| 039 | [Transportation of large equipment and industrial structures from prefabrication or fabrication facility to customer site via truck and rail transport in the fields of construction, energy, pipeline, mining, forestry, oil and gas, manufacturing] | SECTION 8 - CANCELLED | Jul 31, 2011 |
| 042 | Civil, structural and process engineering for the design of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, [industrial building, commercial building, high rise residential building,] office building, [retail building, mixed office, retail and/or residential building,] power plant and power facility, processing plants, plants, underground piping for water, utilities, [hydrocarbon and] sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems,; Custom design and engineering of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, [industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building,] power plant and power facility, processing plants, plants, underground piping for water, utilities, [hydrocarbon] and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, and telephony and voice systems,; Design for others in the fields of computer networks, software, and engineering for the fiber optics, cable data transmission, Internet, high-speed Internet, Internet protocol television systems, telephony and voice systems, road building, road paving, gravel crushing, earth moving, mining, mined material processing, industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building,] power plant and power facility, underground piping for water, utilities, hydrocarbon and sewer, piping for plants, water treatment and purification plants, [solid waste treatment plants,] aqueducts, [and other municipal infrastructure facilities;] Engineering services for the construction of water treatment and purification plants, solid waste treatment plants, aqueducts, and other municipal infrastructure facilities; Engineering services, namely, engineering for the road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, [industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building,] power plant and power facility, underground piping for water, utilities, [hydrocarbon] and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet television systems, and telephony and voice systems, Providing planning and engineering services in the field of information and communications networks; Engineering and design services for the mining industry; inspection of cable television systems, high-speed Internet in Internet protocol television systems, and telephony and voice systems | ACTIVE | Aug 31, 2012 |
| 045 | Seeking and obtaining entitlements, namely, government and regulatory permits, licenses and approvals for the construction, installation and carrying out of projects in the fields of road building, road paving, gravel crushing, earth moving, mining, mined material processing, wind power facilities and farms, [industrial building, commercial building, high rise residential building, office building, retail building, mixed office, retail and/or residential building,] power plant and power facility, [processing plants, plants,] underground piping for water, utilities, [hydrocarbon] and sewer, piping for plants, erection of pre-built structures, equipment rigging and lifting, fiber optics, cable data transmission, Internet, high-speed Internet and Internet protocol television systems, telephony and voice systems | ACTIVE | Aug 31, 2012 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks owned by Ledcor IP Holdings Ltd.
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named FORWARD. TOGETHER.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 24, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 24, 2025 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Feb 24, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 24, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 24, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 24, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 2, 2024 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Sep 2, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Sep 2, 2024 | 9G8P | REGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8 | — |
| Sep 2, 2024 | 8PRT | REGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED | — |
| Jan 27, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 1, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Aug 1, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 1, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 1, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 1, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 1, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jul 23, 2022 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Dec 9, 2019 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 9, 2019 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 11, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Oct 11, 2018 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 11, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 28, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 28, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 23, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jul 23, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 19, 2013 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 18, 2013 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Jun 18, 2013 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| May 22, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 22, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 16, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 18, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 18, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 18, 2012 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 21, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Nov 20, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Nov 16, 2012 | IUAF | USE AMENDMENT FILED | — |
| Nov 16, 2012 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Nov 6, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 11, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 11, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 22, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 3, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 3, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 31, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 31, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 31, 2012 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Feb 1, 2012 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Feb 1, 2012 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Feb 1, 2012 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Feb 1, 2012 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Feb 1, 2012 | ALIE | ASSIGNED TO LIE | — |
| Aug 1, 2011 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Aug 1, 2011 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Aug 1, 2011 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 9, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 8, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 1, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 1, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 1, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 28, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 22, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 22, 2010 | NWAP | NEW APPLICATION ENTERED | — |