USPTO serial 85171813
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Daniel N. Daisak
Daniel N. Daisak Kacvinsky Daisak PLLC4500 Brooktree RoadWexford, PA 15090UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Protective barrier applied to pipes, namely, bacterial and corrosion inhabitants in the nature of a coating; Metal cable trays; metal cable tray systems; metal pipes; welded pipe fittings; razor wire; metal fencing; metal fencing framework; metal posts; metal sign posts; metal conduits; metal tubing; metal fittings and connectors; metal structural tubing; metal framing; metal caging; metal roll form shapes; metal roll form shapes; metal channels; metal struts; metal strut channels; metal building framing systems; metal ceiling grids; space frame systems; prefabricated walls and roofs made primarily of metal; metal angles for construction; metal roof and floor trusses; steel sheets and plates; Cable, cable systems; armored fiber optics; sprinkler pipes for fire suppression; plastic and pvc conduits; metal cable protection materials; electrical wiring; electrical whips and wiring components; electrical infrastructure systems; pre-wired electrical panels; pre-wired electrical A/V boxes; modular lighting systems; electrical power distribution system; temporary lighting; Non-metal cable trays; non-metal cable tray systems; non-metal pipes; non-metal fencing; non-metal cable protection materials; non-metal fittings and connectors; fiberglass channels; fiberglass framing systems; construction safety systems; roof walk systems; Construction design and build services; Fire sprinkler fabrication; metal fabrication; steel coil processing; tube and pipe fabrication | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 23, 2011 | MAB1 | ABANDONMENT NOTICE MAILED - EXPRESS ABANDONMENT | — |
| Jun 23, 2011 | ABN1 | ABANDONMENT - EXPRESS MAILED | — |
| Jan 17, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 17, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 20, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 17, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 11, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 12, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 11, 2010 | NWAP | NEW APPLICATION ENTERED | — |