Drawing for RESISTO

USPTO serial 85181392

RESISTO

Reviewed by CopyMark Law Group

Reg. 4168684Status 800Registered
Filing date
Status date
Registration date
Jul 3, 2012
Examiner
WELLS, CHRISTOPHER
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with RESISTO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Arnaud Rainfray

Arnaud Rainfray O'Brien Barristers and Solicitors LLP140 Grande-Allee Est, office 600Quebec City, G1R5M8CANADA

Goods and services

ClassDescriptionStatusFirst use
001Adhesive primers for use in roofing; urethane polymer compositions used in the manufacture of waterproofing materialsACTIVEJan 1, 2010
002Asphalt-based aluminum paint; primers, primers for preparing surfaces to be repaired; oil spot primer; anti-rust greases and anti-rust oils, anti-corrosive coatings and waterproofing elastomeric based coatings for use on rust, wall and building foundations; raw natural resinsACTIVEMar 1, 2012
006Metal anchoring system for ceilings comprised of lightweight steel metal furrings and lightweight steel metal anchors; aluminum waterproofing membranes composed of elastomeric bitumen and covered with an aluminum sheetACTIVEJan 1, 2010
017Products for use in the construction industry, namely, resin made of polyurethane, bitumen, or rubber used for waterproofing roofs; bitumen-based construction mastics, with or without polymer, used for sealing self-adhesive membranes for waterproofing and repairing ceilings, walls, floors doors, and for weatherproofing windows; waterproofing tape for use in construction; construction mastic adhesive for ceiling, wall and floor tiles, wood panel and asphalt; non-metal subfloor soundproofing polyethylene membranes and polymer membranes coated with rubber granules; nonmetal subfloor acoustic membranes; acoustic insulation materials for buildings; soundproofing panels used to soundproof tubs, spas, baths and showers; building insulation, namely, reflecting insulation and vapor barriers comprised of insulation materials with and without spaces for gas and liquids for use in residential, commercial, industrial and agricultural fields; sealants for building, adhesive sealants for use in roofingACTIVEJan 1, 2010
019Sealing, insulating and waterproofing materials for construction industry, namely, non-metal self-adhesive membranes composed of elastomeric bitumen with a glass mat reinforcement and a sanded top surface, self-adhesive membranes composed of elastomeric bitumen and a trilaminate woven polyethylene facer for roofing, floors and walls; SBS bitumen-based self-adhesive membranes, self-adhesive membranes composed of SBS modified bitumen reinforced with a high resistance composite reinforcement for roofing, floors and walls; sealing and insulating materials, namely, membranes composed of elastomeric bitumen having a glass fiber mat; synthetic roofing underlayment membranes made of polyolefin, self-adhesive roofing underlayment composed of glass fleece reinforcement and SBS modified bitumen; semi-rigid protection board composed of a mineral fortified asphaltic core formed between two saturated fiberglass felts for use as a substrate material for roofs or as a protective board for waterproofing foundations; products for the maintenance, repairs and protection of asphalt surfaces, namely, leveling and crack filler, leveling patch, rubberized crack filler, liquid crack filler, pothole patch and asphalt repair in the nature of asphalt patching compound made of asphalt, rubber, tar or bitumen base; asphalt based products, namely, plastic cement, non fibrous and fibrous coatings for use on asphalt surfaces, adhesive cement in the nature of mastic adhesive for asphalt surfaces, foundation coating, contractor plastic cement, winter plastic cement; asphalt sealer, and patching materials, namely, concrete sealers; anti-corrosive bitumen-based sealants; asphalt-based roofing mastics and mastics for foundations of buildings; SBS modified bitumen-based sealant for metal surfaces restoration and protection such as roofs, campers, mobile homes, farm buildings, reservoirs, water ducts, bitumen-based asphalt sealants, bitumen-based sealants for roofingACTIVEJan 1, 2010

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 18, 2023NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jan 18, 2023RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jan 18, 202389AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jan 18, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 1, 2022E89RTEAS SECTION 8 & 9 RECEIVED—
Jul 3, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
May 15, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
May 15, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
May 15, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 2, 2018E815TEAS SECTION 8 & 15 RECEIVED—
Jul 3, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 14, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 3, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 1, 2012SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 31, 2012REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
May 22, 2012CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 21, 2012SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 21, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 27, 2012IUAFUSE AMENDMENT FILED—
Apr 27, 2012MAILPAPER RECEIVED—
Dec 13, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 18, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 18, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 11, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 7, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 7, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Sep 7, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 7, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 7, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 29, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 29, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 18, 2011ALIEASSIGNED TO LIE—
Aug 11, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 9, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 9, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 9, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 1, 2011DOCKASSIGNED TO EXAMINER—
Nov 24, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 23, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance