Drawing for FULHAM

USPTO serial 85183024

FULHAM

Reviewed by CopyMark Law Group

Reg. 4724018Status 800Registered
Filing date
Status date
Registration date
Apr 21, 2015
Examiner
BRACEY, KAREN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with FULHAM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Peter B. Bromaghim

Peter B. Bromaghim Womble Bond Dickinson (US) LLP400 Spectrum Center DriveSuite 1700Irvine, CA 92618

Goods and services

ClassDescriptionStatusFirst use
009Electrical and electronic lighting blallasts, High Intensity Discharge (HID) ballasts, induction lamp ballasts, LED power supplies; electronic regulating and control devices for the operation of light emitting diodes; light emitting diode (LED) arrays; LED arrays, and clusters for use in instrumentation and illumination devices, in visible light and infra-red spectrum; control devices for controlling light, color and brightness distribution in a light display; lighting drivers and controllers; driving apparatus and control apparatus, namely, electrical and power drivers and electrical and power controllers for lighting systems and for operating and controlling lighting systems; driving apparatus and control apparatus, namely, electrical and power drivers and electrical and power controllers for lighting systems and for operating and controlling video, displays, architectural accent, commercial, industrial, residential lighting applications; LEDs (light-emitting diodes) and LED displays for use in electronic displays and architectural accent, commercial, industrial and residential lighting applications; electronic ballasts for lighting purposes; light engines, namely, electronic power supplies and drivers, and electronic power supplies and drivers combined with LED arraysACTIVE—
011High intensity discharge lamps; external electrode fluorescent lamps; and fluorescent lamps; induction lamps; lighting instruments and apparatus, namely, lighting installations, lighting tubes, luminaires and LED lighting systems, namely, LED modules, power supplies, and wiring; LED lighting fixtures for use in architectural accent, commercial, industrial, residential lighting applications; lighting fixtures; LED (light emitting diode) lighting fixtures for use in display, architectural accent, commercial, industrial, and residential lighting applications, advertisement, messaging, instrumentation and illumination; light sources, namely, lighting arrays and lighting fixtures using LED technologyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 4, 2025NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jul 4, 2025RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jul 4, 202589AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jul 4, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 28, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Apr 21, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 16, 2021NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 16, 2021C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 16, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 21, 2021E815TEAS SECTION 8 & 15 RECEIVED—
Oct 26, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 26, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 21, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 17, 2015SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Mar 16, 2015CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 2, 2015SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Feb 26, 2015AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 23, 2015IUAFUSE AMENDMENT FILED—
Jan 23, 2015EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 3, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 1, 2014EX5GSOU EXTENSION 5 GRANTED—
Jul 1, 2014EXT5SOU EXTENSION 5 FILED—
Jul 1, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 16, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 14, 2014EX4GSOU EXTENSION 4 GRANTED—
Jan 14, 2014EXT4SOU EXTENSION 4 FILED—
Jan 14, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 20, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 18, 2013EX3GSOU EXTENSION 3 GRANTED—
Jul 18, 2013EXT3SOU EXTENSION 3 FILED—
Jul 18, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 25, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 23, 2013EX2GSOU EXTENSION 2 GRANTED—
Jan 23, 2013EXT2SOU EXTENSION 2 FILED—
Jan 23, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 26, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 24, 2012EX1GSOU EXTENSION 1 GRANTED—
Jul 24, 2012EXT1SOU EXTENSION 1 FILED—
Jul 24, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 31, 2012NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 6, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 6, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 16, 2011NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 1, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 31, 2011ALIEASSIGNED TO LIE—
Oct 4, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 7, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 6, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 6, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 4, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 4, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 4, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 3, 2011DOCKASSIGNED TO EXAMINER—
Nov 29, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 26, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance