Drawing for 3D INNOVATION DISCOVER · DEVELOP · DEPLOY

USPTO serial 85214945

3D INNOVATION DISCOVER · DEVELOP · DEPLOY

Reviewed by CopyMark Law Group

Reg. 4031216Status 710
Filing date
Status date
Registration date
Sep 27, 2011
Examiner
YOUNG, CARRIE SKYE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with 3D INNOVATION DISCOVER · DEVELOP · DEPLOY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebecca A. Finkenbinder

REBECCA A. FINKENBINDER MCNEES WALLACE & NURICK LLCPO BOX 1166HARRISBURG, PA 17108-1166UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Renovation, repair and maintenance of metallurgical vessels, industrial boilers and of nuclear plant; reconditioning of metallurgical equipment, namely, renovation, repair and maintenance services; servicing of metallurgical vessels, namely, maintenance and relining of tun dishes, ladles and slag pots, industrial boilers and of nuclear plant; cleaning of metallurgical equipment, industrial boilers and of nuclear plant; cleaning of buildings, roads, gantries, walkways and of runways; installation of metallurgical equipment; construction and maintenance of buildings; painting and sealing of buildings; vermin extermination other than for agriculture; laying of pipesSECTION 8 - CANCELLEDDec 16, 2010
039Warehousing; packing, transporting and delivery of goods and raw materials; loading and unloading of ore, coal, coke, scrap and of slagSECTION 8 - CANCELLEDDec 16, 2010
040Treatment of waste material; reclamation of solids from aqueous media by chemical precipitation; purification of industrial waste water; heat treatment of metals and alloys; reprocessing of nuclear fuels; purification and extraction of minerals by chemical and magnetic methods; electroplating; surface finishing and grinding of articles of common metal; chemical treatment of boilers and pipework thereof; chemical treatment and decontamination of nuclear plant and parts thereof; steel cutting; rental of cutting equipment, scarfing equipment and water treatment equipment; treatment of slag raising from metal casting; welding services for repair and maintenanceSECTION 8 - CANCELLEDDec 16, 2010
042Computer programming; design, development and provision of computer software for the management of logistics, product quality and resource recovery within the metals and minerals industry; design and planning of installations for use in casting of molten metal; scientific laboratory services; analysis and testing of materials; chemical and mechanical engineering consultancy services; geological prospectingSECTION 8 - CANCELLEDDec 16, 2010

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 4, 2018C8..CANCELLED SEC. 8 (6-YR)—
Sep 27, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 12, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 12, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 8, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 6, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 27, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 27, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 20, 2011ALIEASSIGNED TO LIE—
May 19, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 8, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 8, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 8, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 30, 2011DOCKASSIGNED TO EXAMINER—
Jan 15, 2011MPMKNOTICE OF PSEUDO MARK MAILED—
Jan 14, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 14, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance