Drawing for GÜNTNER

USPTO serial 85233373

GÜNTNER

Reviewed by CopyMark Law Group

Reg. 4335318Status 710
Filing date
Status date
Registration date
May 14, 2013
Examiner
THOMAS, JANICE
Law office
TMEG LAW OFFICE 103

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with GÜNTNER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JOHN P. MURTAUGH

JOHN P. MURTAUGH PEARNE & GORDON LLP1801 EAST 9TH STREET, SUITE 1200CLEVELAND, OH 44114-3108UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Condensing installations, namely, air condensers, air cooled condensers, axial fan condensers [, centrifugal fan for condenser; capacitors being parts of machines; machine parts, namely, axial capacitors, radial capacitors, coaxial capacitors, tubular capacitors, steam condensers, air capacitors ] ; air condensers; [ steam engines not for land vehicles; blowing machines for the compression, exhaustion and transport of gases; machine parts, namely, hangers; air compressors; gas compressors; electric compressors ] ; radiators for motors and engines; machine and engine parts, namely, pumps; pumps for heating installations, namely, vacuum pumps, centrifugal pumps, lubricating pumps; [ regulators being parts of machines; fans for motors and engines; carburetors; ] heat exchangers being parts of machines [ ; steam generators being parts of machines ]SECTION 8 - CANCELLEDDec 31, 2002
009[ Scientific, nautical, surveying, ] electric, [ photographic, cinematographic, optical, weighing, ] measuring, signalling [, ] * and * checking [, life-saving and teaching ] apparatus and instruments, namely, [ weighing apparatus and instruments, ] calculating machines and data processing equipment [, sonar equipment ] ; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric switches, electric transformers, electric accumulators, voltage regulators, electrical controllers, power controllers; [ computer software for use in database management and network management, for use as a spreadsheet, and for word processing; ] electrical connecting parts, namely, electrical connectors; electric display apparatus, namely, liquid crystal displays; [ mirrors for inspecting work, namely, work inspection optical mirrors; batteries; electricity limiters; observation instruments, namely, cameras and telescopes; self-regulating fuel pumps for service stations; integrated circuits; integrated circuit chips for encoding and decoding digital video; ] electric installations for the remote control of industrial operations; electric wires; electric cables; electric capacitors; [ electromagnetic coils; remote controls for radios; igniting apparatus, namely, electric igniters for igniting at a distance used in connection with ballasts to start discharge lamps; holders for electric coils; ] high-frequency switches; [ electrical inductors; boiler control instruments; electric contacts; optical condensers for use in microscopes and slide projectors; ] electrical switches; power switches; electric relays; switching equipment, namely, high frequency switching power supplies; electronic circuits; electric distribution consoles; switchboardsSECTION 8 - CANCELLEDDec 31, 2002
011[ Heating apparatus, namely, feed water heaters and electric heaters for commercial use; steam generators; ] heat exchangers not being parts of machines; heat exchangers not being parts of machines, namely, lamellar heat exchangers, [ plate heat exchangers, ] tubular heat exchangers; cooling installations, namely, evaporative air coolers, glycol recoolers and shock frosters; freezers; refrigerator parts, namely, pipes and finned tubes; refrigerating appliances and installations; evaporative air coolers for furnaces; [ refrigerating cabinets, refrigerators; ice machines and apparatus; ] air-conditioning installations; air-conditioning apparatus; evaporators, in particular industrial high-performance evaporators; tubular evaporators; tubular cooling evaporators; heat pump evaporators; heating installations; [ exchange tubes being parts of heating installations; steam generating installations; steam boilers not parts of machines; steam accumulators; electrochemical gas generators; gas heating boilers; gas refrigerator condensers and condenser pipes therefor; electric air heaters for commercial use; ventilation installations, namely, ventilation hoods for stoves; ] level controlling valves in tanks, namely, for use in controlling the level of fluids in tanks; heat pumps; heat regenerators; heat accumulators; cooling installations for water, namely, water coolers and water cooling towers; heat pumps and ventilators for air conditioning systems; ventilator frames being parts of air conditioning installationsSECTION 8 - CANCELLEDDec 31, 2002

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 24, 2023CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
May 14, 2022REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Nov 14, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Nov 14, 2019C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Nov 8, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Oct 27, 2019PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Oct 23, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 24, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 24, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 29, 2019PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Apr 29, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 25, 2019E815TEAS SECTION 8 & 15 RECEIVED—
May 14, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 14, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 9, 2013SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Apr 8, 2013REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Apr 3, 2013CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 28, 2013SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 28, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 7, 2013IUAFUSE AMENDMENT FILED—
Mar 7, 2013EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 24, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 23, 2012EX2GSOU EXTENSION 2 GRANTED—
Aug 23, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 16, 2012EXT2SOU EXTENSION 2 FILED—
Aug 16, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 7, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 5, 2011EX1GSOU EXTENSION 1 GRANTED—
Oct 5, 2011EXT1SOU EXTENSION 1 FILED—
Oct 5, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 20, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 26, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 26, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 17, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 16, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 16, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jun 16, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 16, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 16, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 15, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 15, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 10, 2011ALIEASSIGNED TO LIE—
Jun 3, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 4, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 4, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 4, 2011DOCKASSIGNED TO EXAMINER—
Feb 9, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Feb 8, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 7, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance