USPTO serial 85248097
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew H. Swyers
Matthew H. Swyers The Trademark Company344 MAPLE AVE W STE 151VIENNA, VA 22180-5612| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Consultation in the field of energy efficiency; Consulting services in the fields of energy consumption and usage conservation to improve energy efficiency; Consulting services in the field of energy efficiency for commercial and institutional facilities; Energy auditing; Energy usage management; Energy usage management information services; Promoting public awareness of environmental matters; Promoting the energy efficient products and services of others | SECTION 8 - CANCELLED | — |
| 037 | Air conditioning contractor services; Air duct cleaning services; Basement waterproofing; Bathtub and bath boiler cleaning; Boiler cleaning and repair; Building caulking services; Building construction and repair; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building construction; Building construction information; Building construction observation, namely, static inspection, functional verification inspection, performance verification inspection Building damp-proofing; Building demolition; Building inspection Building maintenance and repair; Building restoration; Building sealing and caulking services; Carpentry; Carpentry contractor services; Charitable services, namely, renovating and constructing homes for low income families; Charitable services, namely, providing maintenance and repairs on the homes of those in need; Charitable services, namely, providing building materials to rebuild homes and businesses; Chimney sweeping; Construction and repair of buildings; Damp proofing services; Drywall and painting contractor services; Drywall contractor services; Electric appliance installation and repair; Framing contractor services; Furnace installation and repair; General construction contracting; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Handyman service, namely, building repair and maintenance; Heating contractor services; Heating equipment installation and repair; Home energy assessment services for the purpose of determining home improvements needed to improve energy use and efficiency; House building and repair; House painting; Housing services, namely, repair, improvement, and construction of residential real property; HVAC contractor services; Installation and maintenance of photovoltaic installations; Installation and maintenance of solar thermal installations; Installation and maintenance of photovoltaic/solar thermal hybrid installations; Installation and replacement service for heating, ventilating and air conditioning systems; Installation and replacement service for water heaters; Installation and repair of heating, ventilating and air conditioning equipment; Installation of basement waterproofing products; Installation of building insulation; Installation of doors and windows; Installation of electrical and generating machinery; Installation of insulating materials; Installation of renewable energy generation equipment; Installation, maintenance and repair of doors; Installation, repair and maintenance of heating equipment; Providing information in the field of home renovations and repairs; Waterproofing of basements | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 7, 2019 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Nov 6, 2017 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 6, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 3, 2012 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Oct 2, 2012 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Oct 1, 2012 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 13, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Sep 13, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Sep 11, 2012 | IUAF | USE AMENDMENT FILED | — |
| Sep 11, 2012 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 20, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 24, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 4, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 20, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 20, 2011 | CHPB | POST PUBLICATION AMENDMENT - ENTERED | — |
| Dec 20, 2011 | ALIE | ASSIGNED TO LIE | — |
| Nov 30, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 29, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 29, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 30, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 30, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 30, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 24, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 26, 2011 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Feb 25, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |