Drawing for PIONEER GROUP

USPTO serial 85252037

PIONEER GROUP

Reviewed by CopyMark Law Group

Reg. 4069914Status 800Registered
Filing date
Status date
Registration date
Dec 13, 2011
Examiner
JOINER, KATINA JACKSON
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with PIONEER GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence E. Laubscher, Jr.

Lawrence E. Laubscher, Jr. LAUBSCHER & LAUBSCHER, P.C.1160 SPA RD STE 2BANNAPOLIS, MD 21403-1099UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037GENERAL CONSTRUCTION AND MAINTENANCE SERVICES, NAMELY, SITE WORK, DEMOLITION, EXCAVATING, CONCRETE POURING AND FINISHING, REBAR INSTALLATION, MASONRY, CARPENTRY, MILLWORK, DOOR AND WINDOW INSTALLATION, INTERIOR FINISHING, ROOFING, SHEET METAL, PRE-ENGINEERED BUILDING ERECTION; MECHANICAL CONSTRUCTION AND MAINTENANCE SERVICING OF PROCESS PIPING, POWER PIPING, BOILERS AND FURNACES, UTILITIES, WATER, SEWER, UNDERGROUND PIPING, PIPING SYSTEM TESTING, EQUIPMENT SETTING, INSTRUMENTATION, FIRE PROTECTION SYSTEM INSTALLATION, PRESSURE VESSELS; FABRICATING AND INSTALLING PIPE AND PIPING SYSTEMS FOR OTHERS, NAMELY, PRESSURE PIPING, POWER PIPING, VESSELS AND TANKS, METAL PIPES, FIBERGLASS PIPES, JACKETED PIPES, MITRED FITTINGS, WELD HEAT TREATMENT; STEEL FABRICATING, ERECTING AND ASSEMBLING SERVICES FOR OTHERS, NAMELY, STRUCTURAL STEEL FRAMING, GIRTS, TRUSSES, TOWERS AND BENTS, MISCELLANEOUS STEEL, PIPE SUPPORTS AND HANGERS, PLATFORMS AND CATWALKS, STAIR TOWERS AND STAIRS, HANDRAILS, CHUTES, HOPPERS, MACHINERY BASES, CONVEYOR FRAMES AND WALKWAYS, SAFETY GATES, PIPE RACKS, VALVE RACKS, SKIDS, LAUNCHERS, RECEIVERS, REBAR AND WIRE INSTALLATION, RIGGING, RIVETING, CUSTOM DRILLING, METAL SIDING, MODULAR COMPONENTS; PLUMBING AND HEATING INSTALLATION SERVICES, NAMELY, INSTALLATION OF NEW AND REPAIRED PLUMBING AND HEATING FIXTURES, BACKFLOW PREVENTER INSTALLATION, STEAM HEATING SYSTEM INSTALLATION AND REPAIR; ELECTRICAL CONSTRUCTION AND MAINTENANCE SERVICES, NAMELY, INSTRUMENTATION CALIBRATION, STARTING ELECTRICAL POWER SYSTEMS, TROUBLESHOOTING IN THE NATURE OF REPAIRING ELECTRICAL SYSTEMS, SAFETY INSPECTIONS, FIBER OPTIC SYSTEMS, MOTORS AND CONTROLS, FIRE ALARM SYSTEMS, CABLE TRAYS; [ NUCLEAR FABRICATING AND ASSEMBLY SERVICES, NAMELY, PRESSURE VESSELS, PUMPS, VALVES, PIPING SYSTEMS, STORAGE TANKS, CORE SUPPORT STRUCTURES, CONCRETE CONTAINMENTS, TRANSPORT PACKAGING, SUPPORTS, STRUCTURAL AND MISCELLANEOUS STEEL, MODULAR COMPONENTS; ] SAFETY INSPECTIONS, NAMELY, BUILDING INSPECTIONS IN THE COURSE OF BUILDING CONSTRUCTIONACTIVEJan 15, 2011

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 1, 2021NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Sep 1, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Sep 1, 202189AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Sep 1, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 6, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 13, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Aug 3, 2017NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 3, 2017C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 3, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 20, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Dec 13, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 13, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 27, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 27, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 23, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 23, 2011ALIEASSIGNED TO LIE—
Aug 9, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 5, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 5, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 5, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 9, 2011GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jun 9, 2011GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Jun 9, 2011CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jun 4, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 4, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 4, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 27, 2011DOCKASSIGNED TO EXAMINER—
Mar 3, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Mar 2, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 1, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance