Drawing for C.FIRE

USPTO serial 85255573

C.FIRE

Reviewed by CopyMark Law Group

Reg. 4296992Status 710
Filing date
Status date
Registration date
Mar 5, 2013
Examiner
PARK, JENNY K
Law office
POST REGISTRATION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with C.FIRE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brian M. Davis

Brian M. Davis VLP Law Group LLP5960 FAIRVIEW RD STE 400CHARLOTTE, NC 28210-3119UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Mechanical apparatus, instruments and machines and installations consisting thereof for the treatment and/or manufacture of semiconductors, silicium, substrates, ingots, solar cells, silicium slices, wafers, compound semiconductors, semiconductor devices, power semiconductors, light-emitting diodes (LED), micromechanical products, namely, MEMS, thin-film-technology products, sensor technology products, nanotechnology products, namely, NEMS and CNT and products from thermally activated processes; vacuum plasma coating apparatus; apparatus and reactors for steam separation on surfaces, namely, CVD-reactors; apparatus, instruments and machines for the supply, conditioning, cleaning and reclaiming of liquids and gases; mechanical apparatus, instruments and machines and apparatus consisting thereof for the mechanical handling, namely, cassette-to-cassette handling system of semiconductors, substrates, wafers and solar cells; instruments, machines and apparatus consisting thereof, namely, inside conveyor transport system for the transport of semiconductors, substrates, wafers and solar cellsSECTION 8 - CANCELLED—
009Semiconductors and compound semiconductors; optical measuring and surveying apparatus for quality and process control of mechanical apparatus, instruments, machines and installations for the treatment and/or manufacture of semiconductors, silicium, substrates, ingots, solar cells, silicium slices, wafers, compound semiconductors, semiconductor devices, power semiconductors, light-emitting diodes (LED), micromechanical products in the nature of MEMS, thin-film-technology products, sensor technology products, nanotechnology products in the nature of NEMS and CNT and products from thermally activated processes; optical measuring and surveying apparatus for quality and process control for vacuum plasma coating apparatus, apparatus and reactors for steam separation on surfaces in the nature of CVD-reactors, apparatus, instruments and machines for the supply, conditioning, cleaning and reclaiming of liquids and gases, mechanical apparatus, instruments and machines and apparatus consisting thereof for the mechanical handling in the nature of combined robot and conveyor system of semiconductors, substrates, wafers and solar cells, instruments, machines and apparatus in the nature of inside conveyor transport system for the transport of semiconductors, substrates, wafers and solar cellsSECTION 8 - CANCELLED—
037[Installation of above mentioned mechanical apparatus, instruments and machines, namely, mechanical apparatus, instruments and machines and installations consisting thereof for the treatment and/or manufacture of semiconductors, silicium, substrates, ingots, solar cells, silicium slices, wafers, compound semiconductors, semiconductor devices, power semiconductors, light-emitting diodes (LED), micromechanical products, namely, MEMS, thin-film-technology products, sensor technology products, nanotechnology products, namely, NEMS and CNT and products from thermally activated processes, vacuum plasma coating apparatus, apparatus and reactors for steam separation on surfaces, namely, CVD-reactors, apparatus, instruments and machines for the supply, conditioning, cleaning and reclaiming of liquids and gases, mechanical apparatus, instruments and machines and apparatus consisting thereof for the mechanical handling, namely, combined robot and conveyor system of semiconductors, substrates, wafers and solar cells, instruments, machines and apparatus consisting thereof, namely, inside conveyor transport system for the transport of semiconductors, substrates, wafers and solar cells at customers and process-related commissioning, namely, putting into service of the above mentioned apparatus, instruments and machines in course of installation for the operation of mechanical apparatus, instruments and machines and for the operation of physical and chemical manufacturing processes as well as for maintenance and customer-specific adaptation, optimization and improvement of the aforementioned products and installation of semiconductors, compound semiconductors, optical measuring and surveying apparatus for quality and process control of the above mentioned mechanical apparatus, instruments and machines]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 15, 2023CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Nov 30, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Nov 30, 2022C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Nov 27, 2022PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Aug 30, 2022EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Apr 27, 2022PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Dec 2, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jun 11, 2019PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Apr 1, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 27, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 27, 2019E815TEAS SECTION 8 & 15 RECEIVED—
Mar 5, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 5, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 18, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 18, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 28, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 13, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 8, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 8, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 8, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 14, 2012GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 14, 2012GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 14, 2012CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 14, 2012ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 26, 2012PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Mar 9, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 9, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 9, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Mar 9, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 9, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 9, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 16, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 15, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 15, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 4, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 14, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 13, 2011ALIEASSIGNED TO LIE—
Dec 7, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 7, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 8, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2011DOCKASSIGNED TO EXAMINER—
Mar 8, 2011MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Mar 6, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 5, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance