Drawing for SUPLEX-TUBESHEET

USPTO serial 85256154

SUPLEX-TUBESHEET

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
ULRICH, NANCY G
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SUPLEX-TUBESHEET?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

William C. Wright

WILLIAM C. WRIGHT EPSTEIN DRANGEL LLP60 E 42ND ST STE 2410NEW YORK, NY 10165-0011UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Heat exchangers as parts of machines and plants made up of these machines for heat recovery from manufacturing processes in the chemical, petrochemical, metallurgical and glass industry, and for heat recovery in power stations; high-temperature air, gas and liquid preheaters being parts of machines and parts of machines that comprise plants that are used in chemical, metallurgical and glass manufacturing processes; recuperators as parts of machines and plants made up of these machines for the use in the metallurgical industry, in mineral wool production melting furnaces, at chemical and petrochemical manufacturing processes and in fluidized bed furnaces for the sludge combustion; heat exchangers as parts of machines and plants made up of these machines for the preheating of air and fuelACTIVE—
011Steam generators for use in gas and heat recovery in steam reforming manufacturing processes, for heat recovery in chemical and metallurgical manufacturing processes, for heat recovery after partial oxidation, in downstream processes of ammonia combustion, and in nitric acid and caprolactam manufacturing processes; heat recovery steam generators in fire tube, water tube and double tube design for chemical, metallurgical and glass technological manufacturing processes; waste heat recovery steam generators for the utilization of gas turbine heat; thermal post-combustion furnaces for dust-laden gases, blast furnace gas containing carbon monoxide and exhaust air containing solvents downstream of various manufacturing processes; Component parts of steam generators, namely, heat exchangers as parts of steam generators used in heat recovery from manufacturing processes in the chemical, petrochemical, metallurgical and glass industries and for heat recovery in power stations; Component parts of steam generators, namely, high-temperature preheaters as parts of steam generators for preheating air, gaseous and liquid substances used in chemical, metallurgical and glass manufacturing processes; Component parts of steam generators, namely, recuperators as parts of steam generators for use in the metallurgical industry, chemical and petrochemical manufacturing processes, fluidized bed furnaces for the sludge combustion and mineral wool production melting furnaces; Component parts of steam generators, namely, heat exchangers as parts of steam generators for preheating air and fuel; Component parts of steam generators, namely, heat exchangers as parts of steam generators for recovery of gas turbine waste heat and process gas coolers which are used in the petrochemical and chemical industry; Component parts of steam generators, namely, heat exchangers as parts of steam generators for recovery of gas turbine waste heatACTIVE—
037Repair and maintenance of heat exchangers as parts of machines and plants made up of these machines for heat recovery from manufacturing processes in the chemical, petrochemical, metallurgical and glass industry, and for heat recovery in power stations; repair and maintenance of high-temperature air, gas and liquid preheaters being parts of machines and parts of machines that comprise plants that are used in chemical, metallurgical and glass manufacturing processes; repair and maintenance of recuperators as parts of machines and plants made up of these machines for the use in the metallurgical industry, in mineral wool production melting furnaces, at chemical an petrochemical manufacturing processes and in fluidized bed furnaces for the sludge combustion; repair and maintenance of heat exchangers as parts of machines and plants made up of these machines for the preheating of air and fuel Steam generators for use in gas and heat recovery in steam reforming manufacturing processes, for heat recovery in chemical and metallurgical manufacturing processes, for heat recovery after partial oxidation, in downstream processes of ammonia combustion, and in nitric acid and caprolactam manufacturing processes; repair and maintenance of heat recovery steam generators in fire tube, water tube and double tube design for chemical, metallurgical and glass technological manufacturing processes; repair and maintenance of waste heat recovery steam generators for the utilization of gas turbine heat; repair and maintenance of thermal post-combustion furnaces for dust-laden gases, blast furnace gas containing carbon monoxide and exhaust air containing solvents downstream of various manufacturing processes; repair and maintenance of component parts of steam generators, namely, heat exchangers as parts of steam generators used in heat recovery from manufacturing processes in the chemical, petrochemical, metallurgical and glass industries and for heat recovery in power stations; repair and maintenance of component parts of steam generators, namely, high-temperature preheaters as parts of steam generators for preheating air, gaseous and liquid substances used in chemical, metallurgical and glass manufacturing processes; repair and maintenance of component parts of steam generators, namely, recuperators as parts of steam generators for use in the metallurgical industry, chemical and petrochemical manufacturing processes, fluidized bed furnaces for the sludge combustion and mineral wool production melting furnaces; repair and maintenance of component parts of steam generators, namely, heat exchangers as parts of steam generators for preheating air and fuel; repair and maintenance of component parts of steam generators, namely, heat exchangers as parts of steam generators for recovery of gas turbine waste heat and process gas coolers which are used in the petrochemical and chemical industry; repair and maintenance of component parts of steam generators, namely, heat exchangers as parts of steam generators for recovery of gas turbine waste heatACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Mar 23, 2015MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 23, 2015ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 20, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 19, 2014EX3GSOU EXTENSION 3 GRANTED—
Aug 7, 2014EXT3SOU EXTENSION 3 FILED—
Aug 7, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 26, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 25, 2014EX2GSOU EXTENSION 2 GRANTED—
Feb 10, 2014EXT2SOU EXTENSION 2 FILED—
Feb 10, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 21, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 20, 2013EX1GSOU EXTENSION 1 GRANTED—
Aug 14, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jul 17, 2013EXT1SOU EXTENSION 1 FILED—
Jul 17, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 19, 2013NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 25, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 25, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 5, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 16, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 5, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 15, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 15, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 15, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 31, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2012RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jul 9, 2012ALIEASSIGNED TO LIE—
Jun 28, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 28, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 28, 2012ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jan 8, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 8, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Jan 8, 2012CNSLSUSPENSION LETTER WRITTEN—
Dec 9, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 9, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2011DOCKASSIGNED TO EXAMINER—
Mar 8, 2011MPMKNOTICE OF PSEUDO MARK MAILED—
Mar 7, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 5, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance