Drawing for PROJECT COMPLETE

USPTO serial 85265036

PROJECT COMPLETE

Reviewed by CopyMark Law Group

Reg. 4079388Status 710
Filing date
Status date
Registration date
Jan 3, 2012
Examiner
FRENCH, CURTIS W
Law office
TMO LAW OFFICE 115

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with PROJECT COMPLETE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ned W. Randle

Maverick Technologies Holdings, LLC265 Admiral Trost RoadColumbia, IL 62236UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Engineering and engineering consulting services in the fields of information technology, automation, manufacturing, enterprise integration, Enterprise Manufacturing Intelligence (EMI), Enterprise Application Integration (EAI), sustaining services, and electronic business, namely, scope development; front-end engineering services; engineering project management; Technological consulting services in the field of energy optimization, manufacturing plant documentation for operations, engineering, PLC/DCS/HMI specification/development/configuration, P and ID design/development, control narrative definition, detailed electrical instrumentation design, electrical instrument specification, evaluation, electrical area classification, high-, medium-and low-voltage power distribution design/implementation, hardwired safety interlock design, software safety interlock design, electrical heat trace design, electrical control cabinet construction, control cabinet design and layout, network design and layout, process simulation/customer acceptance; computer networking and system architecture design and implementation; Internet, intranet and extranet website drafting, design and development; custom database design and configuration; preparing engineering compliance reports; visual basic development; engineering consulting services, namely, technician calibration, outage services and planning, advanced process control solutions, demand planning, production planning and scheduling, logistics and distribution, manufacturing execution/production management, manufacturing intelligence, quality management, system health checks, product update monitoring, subsystem communication, system simulation; Remote computer network technical monitoring and software maintenance services; Computer services, namely, data recovery servicesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 15, 2022CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Jan 3, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jul 22, 2017NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jul 22, 2017C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jul 22, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 31, 2017E815TEAS SECTION 8 & 15 RECEIVED—
May 31, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 3, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jan 3, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 18, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 18, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 13, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 12, 2011ALIEASSIGNED TO LIE—
Aug 26, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 25, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Aug 25, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 25, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 25, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 2, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 26, 2011DOCKASSIGNED TO EXAMINER—
Mar 17, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance