Drawing for TALON LPE

USPTO serial 85295325

TALON LPE

Reviewed by CopyMark Law Group

Reg. 4073495Status 710
Filing date
Status date
Registration date
Dec 20, 2011
Examiner
IM, JEAN H
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with TALON LPE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Audie Sciumbato

AUDIE SCIUMBATO UNDERWOOD LAW FIRM500 S TAYLOR ST STE 1200AMARILLO, TX 79101-2442UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Construction and renovation of buildings; Construction and repair of buildings; Construction consultation; Construction grading services; Construction management; Construction of buildings; Construction of roads, underground utilities, and housing pads; Construction of structures for the production of crude oil; Construction of structures for the production of natural gas; Construction planning; Construction project management services; Construction services, namely, installation of environmental containment systems; Construction, maintenance and renovation of property; Drilling of wells; General construction contracting; Physical clean-up of exploration and drilling project locations to restore them to their original condition; Road construction; Technical consultation in the field of building construction; Water well drilling; Well drillingSECTION 8 - CANCELLEDAug 1, 1999
040Environmental remediation services, namely, treatment of soil and waterSECTION 8 - CANCELLEDAug 1, 1999
042Construction drafting; Consulting services in the field of environmental assessment and planning; Engineering services in the field of environmental compliance; Environmental engineering, testing and inspection services; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Environmental testing and inspection services; Technical consultancy in the field of environmental science; Technical consulting in the field of environmental engineeringSECTION 8 - CANCELLEDAug 1, 1999

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 27, 2018C8..CANCELLED SEC. 8 (6-YR)—
Dec 20, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 20, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 4, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 4, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 4, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 1, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 30, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 30, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 30, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 24, 2011ALIEASSIGNED TO LIE—
Aug 15, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 26, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 20, 2011DOCKASSIGNED TO EXAMINER—
Apr 19, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Apr 18, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 18, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance