Drawing for WATER MANAGEMENT INC.

USPTO serial 85323874

WATER MANAGEMENT INC.

Reviewed by CopyMark Law Group

Reg. 4188942Status 710
Filing date
Status date
Registration date
Aug 14, 2012
Examiner
KELLY, JOHN M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with WATER MANAGEMENT INC.?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
042consulting services in the field of the design of water management systems and water conservation management systems; design for others in the field of water management and water conservation management; consulting in the field of design and development of water systems and use and comprehensive plans for buildings, plants and facilities and water systems and use of water systems in buildings, plants and facilities; engineering services, namely, geotechnical engineering, civil engineering, structural engineering, and mechanical engineering; environmental engineering and surveying; construction quality control, namely, inspection and materials testing; providing testing services and inspection services in the field of water management, energy management, water management systems and energy management systems; conducting engineering and technical surveys; surveying and engineering; conducting of feasibility studies; conducting engineering studies; conducting engineering project studies; design engineering services in the field of water management, energy management, water management systems and energy management systems and consulting services in connection therewith; facilities design engineering services and consulting services in connection therewith; materials testing, materials inspection, and consulting services in connection therewith; environmental engineering services; research in the field of water management, energy management, water management systems and energy management systems and in the field of construction of water management, energy management, water management systems and energy management systems; scientific research; industrial research in the field of water management, energy management, water management systems and energy management systems; architectural and engineering project management services, namely, consulting in the fields of engineering and architecture; consultation services in the field of environmental assessment, compliance and planning; urban planning; project design management, namely, design for others in the fields of engineering and architecture; construction drafting; engineering, and technical advisory services concerning engineering; technical drawing and testing services, namely, technical surveying; quality testing and design services, namely, material testing; quality control services for others; architectural design; architectural and interior design services; computer modeling services for interpreting, assessing and simulating environmental conditions; providing engineering-based assessments of physical facilities and operating subsystems for use by others to determine condition and remaining useful life; industrial facility asset management, namely, providing engineering-based physical field assessments and oversight of facilities and major operating components for others, and recommending design solutions for facility deficiencies; provision of information, advisory and consultancy services relating to all the aforesaid servicesSECTION 8 - CANCELLEDFeb 8, 1991

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 15, 2019C8..CANCELLED SEC. 8 (6-YR)
Sep 28, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Aug 14, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 29, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 9, 2012NPUBNOTICE OF PUBLICATION
Apr 24, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 23, 2012ALIEASSIGNED TO LIE
Mar 30, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 14, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 13, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 13, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2011CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 4, 2011DOCKASSIGNED TO EXAMINER
May 24, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED
May 22, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 21, 2011NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance