Drawing for RWE

USPTO serial 85343815

RWE

Reviewed by CopyMark Law Group

Reg. 4208644Status 710
Filing date
Status date
Registration date
Sep 18, 2012
Examiner
JUN, WON KYUNG WENDY
Law office
—

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with RWE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence H. Binderow, Attorney at Law

LAWRENCE H. BINDEROW, ATTORNEY AT LAW BINDEROW LAW OFFICES1330 Camino Del MarSuite 250DEL MAR, CA 92014

Goods and services

ClassDescriptionStatusFirst use
004[ (Based on 44(e)) INDUSTRIAL OILS AND GREASES; ALL PURPOSE LUBRICANTS; DUST ABSORBING, WETTING AND BINDING COMPOSITIONS FOR USE IN FUELS; GASEOUS AND LIQUID FUELS, HEATING FUELS; LUMINESCENT MATERIALS, NAMELY, LIGHTING FUELS; NATURAL GAS; LIQUEFIED NATURAL GAS (LNG); PETROLEUM; ] COAL [ ; ELECTRICAL ENERGY; FUELS INCLUDING ENGINE FUELS AND LUMINESCENT MATERIALS; FUEL GAS; FUEL GAS BLENDS; FUEL OILS; OIL LUBRICANTS; GAS, namely, FUEL GAS, NATURAL GAS, LIQUEFIED PETROLEUM GAS; CANDLES AND WICKS FOR CANDLES FOR LIGHTING; (Based on Use in Commerce) and (Based on 44(e)) LIGNITE ]SECTION 8 - CANCELLEDJan 1, 2009
007[ (Based on 44(e)) ELECTRICAL AND ELECTRONIC APPARATUS AND EQUIPMENT ALL FOR USE IN GENERATING ENERGY, NAMELY, ELECTRIC GENERATORS ]SECTION 8 - CANCELLED—
009[ (Based on 44(e)) APPARATUS AND INSTRUMENTS FOR CONDUCTING, SWITCHING, TRANSFORMING, ACCUMULATING, REGULATING OR CONTROLLING ELECTRICITY, NAMELY, ELECTRICITY CONDUITS, ADAPTERS, ELECTRICITY LIMITERS; ELECTRICAL AND ELECTRO TECHNICAL DEVICES, APPARATUS AND INSTRUMENTS, NAMELY, ELECTROMAGNETIC COILS; ELECTRIC REMOTE IGNITION APPARATUS IN THE NATURE OF REMOTE CONTROLS FOR IGNITING ENGINES; ELECTRIC CABLES; ELECTRIC TRANSFORMERS; ELECTRIC FUEL AND PRESSURE GAUGES; DISTRIBUTION BOXES FOR ELECTRICAL POWER; ELECTRICITY LIMITERS; VOLTAGE SURGE SUPPRESSORS; MEASURING APPARATUS, namely, CLAMP METERS FOR MEASURING ELECTRICITY; DEVICES, APPARATUS AND INSTRUMENTS FOR CONDUCTING, DISTRIBUTING, TRANSFORMING, SAVING, REGULATING AND/OR CONTROLLING ELECTRICAL CURRENT, NAMELY, CURRENT CONVERTERS, ELECTRIC CURRENT SWITCHES ]SECTION 8 - CANCELLED—
035[ Based on 44e BUSINESS MANAGEMENT AND ORGANIZATIONAL CONSULTING IN BUSINESS MATTERS IN THE ENERGY SECTOR; PROCUREMENT SERVICES, NAMELY, FOR THE PURCHASE OF ENERGY, ENERGY SUPPLY AND FUEL AND THE PROCUREMENT OF CONTRACTS FOR OTHERS REGARDING TRANSPORT CAPACITY, TRANSPORT SERVICES BY MEANS OF SUPPLY NETWORKS, STORAGE CAPACITIES AND GAS STRUCTURING SERVICES; BUSINESS CONSULTATION FOR THIRD PARTIES IN THE FIELD OF PRODUCTION, PROCUREMENT, TRANSPORT AND USAGE OF ENERGY; BUSINESS CONSULTATION IN THE OPTIMIZATION OF HEAT GENERATING PLANTS; COMMERCIAL BUSINESS MANAGEMENT FOR THIRD PARTIES IN THE FIELDS OF ENERGY AND GAS; COMMERCIAL BUSINESS MANAGEMENT FOR THIRD PARTIES IN THE FIELD OF HEAT GENERATING PLANTS; COST-PRICE ANALYSIS IN THE FIELD OF ENERGY PROCUREMENT AND ENERGY SUPPLY; ARRANGING OF TRADING TRANSACTIONS AND COMMERCIAL CONTRACTS RELATING TO TRANSPORT RIGHTS IN PIPELINE NETWORKS; BILLING OF ENERGY DELIVERIES FOR THIRD PARTIES; CONSULTATION SERVICES IN THE FIELD OF ENERGY EFFICIENCY; TECHNICAL CONSULTATION SERVICES IN THE AREA OF ENERGY USAGE MANAGEMENT ]SECTION 8 - CANCELLED—
036[ (Based on 44(e)) BUSINESS FINANCE PROCUREMENT SERVICES, NAMELY, PROCUREMENT OF FINANCIAL INVESTMENTS IN COMPANIES THAT ARE ACTIVE IN THE AREAS OF ENERGY PROCUREMENT, ENERGY SUPPLY, COMMERCE WITH GASEOUS AND LIQUID FUEL, HEATING FUEL, FUEL AND LUMINESCENT MATERIAL, IN PARTICULAR NATURAL GAS, LIQUEFIED NATURAL GAS (LNG), PETROLEUM, COAL AND ELECTRICAL ENERGY; TRADING IN SECURITIES RELATING TO RAW MATERIAL CERTIFICATES, EMISSION RIGHTS CERTIFICATES AND FOREIGN CURRENCY ]SECTION 8 - CANCELLED—
037[ (Based on 44(e)) SERVICES IN THE FIELDS OF POWER AND ELECTRICAL TECHNOLOGY, namely, MAINTENANCE, SERVICING, INSTALLATION, AND REPAIRS OF POWER PLANTS; CONSTRUCTION AND MAINTENANCE OF SUPPLY NETWORKS FOR THE TRANSPORT OF NATURAL GAS, LIQUEFIED NATURAL GAS, OIL, ELECTRIC POWER; EXPLORATIVE WELL DRILLING IN SEARCH OF MINERAL RESOURCES, OTHER RAW MATERIALS, OIL AND GAS FOR ENERGY AND CHEMICAL AND PETROCHEMICAL PRODUCTS; CONSTRUCTION PLANNING OF PIPELINES AND CABLES IN THE AREA OF GAS ]SECTION 8 - CANCELLED—
039[ (Based on 44(e)) SUPPLY CHAIN LOGISTICS AND REVERSE LOGISTICS SERVICES, NAMELY, TRANSPORTATION AND DELIVERY OF ELECTRICAL ENERGY, GAS, AND DISTRICT HEATING TO COMMUNES, PRIVATE HOUSEHOLDS, BUSINESSES; SUPPLY CHAIN LOGISTICS AND REVERSE LOGISTICS SERVICES, NAMELY, STORAGE, TRANSPORTATION AND DISTRIBUTION OF ENERGY AND FUEL BY MEANS OF SUPPLY NETWORKS AND PIPELINES; TRANSPORTATION AND DISTRIBUTION OF GRID GAS, NATURAL GAS AND LIQUEFIED NATURAL GAS, ELECTRICITY, WATER AND DISTRICT HEATING; TECHNICAL CONSULTATION IN THE AREA OF TRANSPORTATION OF GRID GAS, NATURAL GAS AND LIQUEFIED NATURAL GAS, ELECTRICITY, WATER AND DISTRICT HEATING ]SECTION 8 - CANCELLED—
040[ (Based on 44(e)) PRODUCTION OF ENERGY, IN PARTICULAR THROUGH WATER, PETROLEUM, AND NATURAL GAS; FUEL REFINING, NAMELY, PROCESSING OF MINERAL RESOURCES, RAW MATERIALS, ENERGY, CHEMICAL AND PETROCHEMICAL PRODUCTS; ] TECHNICAL CONSULTATION IN THE FIELD OF ENVIRONMENTALLY COMPATIBLE AND EFFICIENT ENERGY PRODUCTION; TECHNICAL CONSULTATION IN THE AREA OF PRODUCTION OF [ GRID GAS, NATURAL GAS AND LIQUEFIED NATURAL GAS, ] ELECTRICITY [ AND DISTRICT HEATING; TECHNICAL CONSULTATION FOR CONSUMERS AND BUSINESSES IN THE FIELD OF PRODUCTION OF ENERGY THAT IS ENVIRONMENTALLY FRIENDLY AND EFFICIENT ]SECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 31, 2023CAEXCANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9—
Sep 18, 2021REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Apr 10, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Apr 10, 2019C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Apr 10, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 7, 2019E815TEAS SECTION 8 & 15 RECEIVED—
Sep 18, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 18, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 3, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 3, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 13, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 30, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 25, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 25, 2012XAECEXAMINER'S AMENDMENT ENTERED—
May 25, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 25, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
May 25, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
May 22, 2012ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 7, 2012PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 21, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 19, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 18, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Apr 17, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 17, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 17, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 11, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Apr 11, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 11, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 11, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 28, 2012GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 28, 2012GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 28, 2012CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 6, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 6, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 15, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 27, 2011CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Sep 26, 2011ALIEASSIGNED TO LIE—
Sep 23, 2011GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Sep 23, 2011GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Sep 23, 2011CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Sep 23, 2011DOCKASSIGNED TO EXAMINER—
Jun 15, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 14, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance