USPTO serial 85381209
ENGINEERING LASTING RELATIONSHIPS WITH INNOVATIVE SOLUTIONS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 7, 2012
- Examiner
- ROACH, APRIL K
- Law office
- TMO LAW OFFICE 115
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ENGINEERING LASTING RELATIONSHIPS WITH INNOVATIVE SOLUTIONS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Professional Engineering Consultants, P.A.
Wichita, KS
Other trademarks owned by Professional Engineering Consultants, P.A.
Professional Engineering Consultants, P.A.
Wichita, KS
Other trademarks owned by Professional Engineering Consultants, P.A.
Professional Engineering Consultants, P.A.
Wichita, KS
Other trademarks owned by Professional Engineering Consultants, P.A.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William P. Matthews
WILLIAM P. MATTHEWS FOULSTON SIEFKIN LLP1551 N WATERFRONT PKWY STE 100WICHITA, KS 67206-4466UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Inspection services in the course of construction of residential, commercial, industrial buildings; consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; land development services, namely, planning and laying out of residential and/or commercial communities and commercial buildings; consulting services in the field of residential, commercial, or industrial real estate site selection; construction management, planning, consultation and supervision services | SECTION 8 - CANCELLED | Aug 26, 2011 |
| 042 | Engineering; drafting of plans and engineering drawings for others; civil engineering services; custom design services, testing services, inspection services and technical consulting services in the field of civil engineering; engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; custom design of drainage, erosion, stormwater, watershed and flood control and management systems and consulting services in connection therewith; engineering services for the design and construction of airports and airfields, and consulting services in connection therewith; facilities design engineering services and consulting services in connection therewith; design planning and engineering of buildings and infrastructure systems for buildings; engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; electrical engineering; foundation engineering, foundation testing and design services for others, and consulting services in connection therewith; engineering services in the field of energy efficiency; engineering services in the fields of traffic and transportation; design engineering services in the field of transportation systems and consulting services in connection therewith; environmental engineering, testing and inspection services; geoenvironmental engineering; geotechnical testing services and consulting services in connection therewith; hydrological and hydraulic engineering and design engineering services; providing testing and inspection services in the field of hydrological and hydraulic sciences and consulting services in connection therewith; mechanical engineering; testing inspection and consulting services in the field of mechanical systems; structural engineering design services; testing, inspection and consulting services in the field of structural engineering; construction engineering and design services for others and providing consulting services in connection therewith; traffic and transportation engineering; transportation and traffic design planning and integration services; materials engineering; materials testing, analyzing, evaluation, and testing services and consulting services in connection therewith; engineering, technical, architectural, geological, topographic, land, and roadway surveying | SECTION 8 - CANCELLED | Aug 26, 2011 |
| 045 | Consulting services in the field of residential, commercial, or industrial real estate zoning permitting and compliance | SECTION 8 - CANCELLED | Aug 26, 2011 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Professional Engineering Consultants, P.A.
- Other trademarks owned by Professional Engineering Consultants, P.A.
- Other trademarks owned by Professional Engineering Consultants, P.A.
- Other trademarks in Class 037
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named ENGINEERING LASTING RELATIONSHIPS WITH INNOVATIVE SOLUTIONS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 17, 2023 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Mar 16, 2018 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - MAILED | — |
| Mar 16, 2018 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Mar 16, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 9, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 27, 2018 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Aug 7, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 5, 2012 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED | — |
| Jul 4, 2012 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Jun 29, 2012 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jun 14, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 14, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 4, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 17, 2012 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 17, 2012 | CNRT | SU - NON-FINAL ACTION - WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2012 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| May 14, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 18, 2012 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 20, 2012 | IUAF | USE AMENDMENT FILED | — |
| Mar 20, 2012 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 4, 2012 | NPUB | NOTICE OF PUBLICATION | — |
| Dec 19, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 14, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 14, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 14, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 9, 2011 | ALIE | ASSIGNED TO LIE | — |
| Nov 30, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 23, 2011 | CEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION MAILED | — |
| Nov 23, 2011 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Nov 16, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 30, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 29, 2011 | NWAP | NEW APPLICATION ENTERED | — |