Drawing for TECHNIP TAKE IT FURTHER

USPTO serial 85396505

TECHNIP TAKE IT FURTHER

Reviewed by CopyMark Law Group

Reg. 4737272Status 710
Filing date
Status date
Registration date
May 19, 2015
Examiner
BESCH, JAY C
Law office
POST REGISTRATION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with TECHNIP TAKE IT FURTHER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys including stainless steel; metallic building materials, namely, metal soffits, metal fascia, metal ceiling boards, metal floor boards, metal building flashing, linings of metal for building purposes; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metals; locks and hardware of metal, namely, metal locks, metal locksets, pulleys, springs, nuts, washers, keys and key cylinders, non-powered door actuators; metal pipes; metal safes; metal goods, namely, prefabricated buildings of metal, metal pipes; metal ores; metal pipes, namely, rigid and flexible pipes and pipes of metal and primarily of metal, to operate, extracting and transporting mineral materials and especially oil and natural gas; prefabricated metal bridges for oil platforms and components thereforSECTION 8 - CANCELLED
007Machines, namely, grinders, and industrial robots; machine tools, namely, broaches, chasers, electro-chemical discharge machine tools for metalworking, gear cutters, lathes, machine tools for removing waste material, taps, thread milling cutters; engines not for land vehicles; machine coupling and transmission components except for land vehicles; agricultural implements, namely, incorporators, seed drills, hay balers, coulters, cultivators, harvestors, disk harrows, seeders, plows, mowers, reapers, hay rakes, manure spreaders, rollers, corn huskers, fertilizer distributors, broadforks, chicken pluckersSECTION 8 - CANCELLED
037Construction of buildings; chimney sweeping; painting; plastering; plumbing; roofing services; public works, namely, concrete pouring and forming for building and other commercial or public concrete structures, road paving, road construction, road sealing and stripping, construction of underground utilities and housing pads; rural works, namely, road construction, road paving, road sealing and stripping, construction of underground utilities and housing pads; rental of tools for repair and maintenance, construction equipment, bulldozers, and tree extractors; building maintenance; cleaning of buildings, industrial premises, and floors; disinfecting; repair and maintenance of buildings, namely, façade resurfacing; disinfection; pest control in the nature of rodent control; laundry services; repair of clothing; tire retreading; vulcanizing of automobile tires; shoe repair; repair of furniture and machine tools; repair of laboratory instruments, and measuring and testing machines and instruments; drilling, namely, drilling for crude oil, drilling of deep oil or gas wells, drilling of wells, metal drilling and perforation; providing information in the fields of building construction, aircraft construction, shipbuilding, construction supervision, and installation and repair of electrical appliances; construction and repair of warehouses; mining extraction; masonry; construction of piers; construction of naval scaffolding; submarine repair; submarine construction, namely, shipbuilding; road paving; treatment against rust, namely, rust removal, rustproofingSECTION 8 - CANCELLED
039Transport of passengers and goods; water and electricity distribution; furniture removal services, namely, furniture moving; ferryboat operating; maritime towing, unloading and refloating of ships; packaging of goods, namely, merchandise packaging for others, packaging articles for transportation; travel information; travel agency services, namely, making reservations and bookings for transportation; horse and transport vehicle rental; warehousing services; storage of merchandise in a warehouse for protection or safekeeping purposes; storage and safekeeping of clothes; vehicle parking; refrigerator rental; garage rental; transport brokerage, ship brokerage, distribution of energy, boat storage; navigation services, namely, GPS navigation services, aeronautical radio navigation services; transport by ferry; transport by pipelinesSECTION 8 - CANCELLED
040Service of treatment of hydrocarbons for production of ethylene, namely, fuel treatment services; transformation of agricultural products for others, namely, winery services, custom production of wine for others, alcohol distillery, chemical distillery, spirits distillery, threshing, fruit crushing, flour milling; sawmill services, sawmill planing; embroidery, dressmaking; dyeing; cutting of cloth, fabric, textiles, metal; treatment of metal, namely, polishing of metal coating; preservation services during which an object undergoes a change, namely, cryogenic preservation, food preservation services, treatment of wood for preservation purposes; dyeing of cloth or clothing; mothproofing treatment of textiles; waterproofing of fabric; document binding services; tin-plating; air purification and air freshening; treatment of color separation, namely, color separation services; waste treatment, treatment of oil, namely, oil refining, processing of oil, blending of crude oil and synthetic oils; printing; transformation of clothing, namely, clothing alterationSECTION 8 - CANCELLED
042Prospecting, namely, geological prospecting and oil prospecting; engineering; professional consultation in the field of computers, namely, computer consultation; professional consultation in the field of preparation of plans, namely, construction drafting consultation; engineering works, namely, chemical engineering, design of engineering projects; material testing; laboratory work, namely, scientific laboratory services, optical laboratories, medical laboratories; engineering for activities devoted to industrial areas, assemblies and industrial units and for turnkey infrastructure, renovation, rehabilitation and modernization of industrial units and complexes; engineering services in the field of equipment and tertiary facilities; petroleum engineering; drilling services, both on land and sea, namely, oil and gas well drilling services in the nature of providing measurements and downhole telemetry while drilling; engineering, namely, continental and submarine engineering; technical surveying; research and development of new processes in the field of biotechnology and computer science for others; geological estimates, research and prospecting; searches of oil slicks, gas and mineral deposits in general, namely, geophysical exploration for the oil, gas and mining industries; scientific research; industrial research in the field of building materials, industrial robots, machine tools; computer programming; chemistry research, chemist services; chemical analysis; computer systems design services; construction drafting consultation; preparation in the nature of drafting of plans for construction; control of oil wells, namely, well logging and testing; quality control for others; industrial design; advice on saving energy, namely, consulting services in the fields of energy measurement to improve energy efficiency; study of technical projects, namely, technical surveying, technical research in the field of aeronautics, technical consultancy in the field of environmental science; surveying, oil field surveys, conducting geological surveys, underwater exploration, analysis of oilfields, oil prospecting; research in the field of environmental protection; research and development of new products for others; biological research, bacteriological research, mechanical research, geological research; technical research in the field of aeronauticsSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 26, 2021C8..CANCELLED SEC. 8 (6-YR)
Aug 5, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Aug 5, 2021ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Aug 5, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 5, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 30, 2021WOAGWITHDRAWAL OF ATTORNEY GRANTED
Jul 30, 2021WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED
Jul 29, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jul 29, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jul 29, 2021EWORTEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED
Jul 29, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 29, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 29, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
May 19, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jan 4, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Feb 5, 2016COC.CORRECTION UNDER SECTION 7 - PROCESSED
Feb 1, 2016EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Jan 5, 2016PRAMPOST REGISTRATION ACTION MAILED - SEC. 7
Jan 4, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 18, 2015ES7RTEAS SECTION 7 REQUEST RECEIVED
May 19, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 12, 2015DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION
Mar 4, 2015IUCNNOTICE OF ALLOWANCE CANCELLED
Mar 4, 2015D1BRTEAS DELETE 1(B) BASIS RECEIVED
Sep 17, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Sep 16, 2014EX4GSOU EXTENSION 4 GRANTED
Sep 11, 2014EXT4SOU EXTENSION 4 FILED
Sep 11, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 19, 2014EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 18, 2014EX3GSOU EXTENSION 3 GRANTED
Mar 11, 2014EXT3SOU EXTENSION 3 FILED
Mar 11, 2014EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 18, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Oct 17, 2013EX2GSOU EXTENSION 2 GRANTED
Oct 11, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
Sep 11, 2013EXT2SOU EXTENSION 2 FILED
Sep 11, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 6, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Mar 4, 2013EX1GSOU EXTENSION 1 GRANTED
Mar 4, 2013EXT1SOU EXTENSION 1 FILED
Mar 4, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 11, 2012NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 17, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 17, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 27, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 12, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 11, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 8, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 8, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 8, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Dec 8, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2011DOCKASSIGNED TO EXAMINER
Oct 22, 2011AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Oct 20, 2011ALIEASSIGNED TO LIE
Oct 14, 2011PARITEAS VOLUNTARY AMENDMENT RECEIVED
Aug 18, 2011MDSMNOTICE OF DESIGN SEARCH CODE MAILED
Aug 17, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 16, 2011NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance