Drawing for EPCON

USPTO serial 85401626

EPCON

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
COLEMAN, CIMMERIAN
Law office
TTAB

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 604: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with EPCON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael J. Forbes

MICHAEL J FORBES WINSTON STRAWN LLP1111 LOUISIANA FL 25HOUSTON, TX 77002UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Computer software for, namely, the design, analysis, simulation, optimization, management and research of fluid flow systems, pipeline networks, thermophysical properties, physical properties, process simulation, process safety simulation, equipment sizing and equipment design for process manufacturing plants, petroleum refineries, chemical manufacturing plants, power distribution plants, water treatment plants, food processing plants, gas processing plants and paper manufacturing plants, offered with and without user manuals and that may be downloaded from a global computer networkABANDONEDJan 1, 1984
016Printed manuals in the field of computer software for the design, analysis, simulation, optimization, management and research of fluid flow systems, pipeline networks, thermophysical properties, physical properties, process simulation, process safety simulation, equipment sizing and equipment design for process manufacturing plants, petroleum refineries, chemical manufacturing plants, power distribution plants, water treatment plants, food processing plants, gas processing plants and paper manufacturing plantsABANDONEDJan 1, 1984
041Training in the use of computer software for the design, analysis, simulation, optimization, management and research of fluid flow systems, pipeline networks, thermophysical properties, physical properties, process simulation, process safety simulation, equipment sizing and equipment design for process manufacturing plants, petroleum refineries, chemical manufacturing plants, power distribution plants, water treatment plants, food processing plants, gas processing plants and paper manufacturing plants, either online or on premise or both; Providing on-line publications, namely, manuals in the field of computer software for the design, analysis, simulation, optimization, management and research of fluid flow systems, pipeline networks, thermophysical properties, physical properties, process simulation, process safety simulation, equipment sizing and equipment design for process manufacturing plants, petroleum refineries, chemical manufacturing plants, power distribution plants, water treatment plants, food processing plants, gas processing plants and paper manufacturing plantsABANDONEDJan 1, 1984
042Technical consulting services in the field of engineering, namely, design, analysis, simulation, optimization, management and research of fluid flow systems, pipeline networks, thermophysical properties, physical properties, process simulation, process safety simulation, equipment sizing and equipment design for process manufacturing plants, petroleum refineries, chemical manufacturing plants, power distribution plants, water treatment plants, food processing plants, gas processing plants and paper manufacturing plantsABANDONEDJan 1, 1984

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 26, 2013MAB4ABANDONMENT NOTICE MAILED - INTER PARTES DECISION—
Aug 26, 2013ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Aug 26, 2013OP.TOPPOSITION TERMINATED NO. 999999—
Aug 26, 2013OP.DOPPOSITION DISMISSED NO. 999999—
Mar 18, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 18, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 6, 2012OP.IOPPOSITION INSTITUTED NO. 999999—
Sep 6, 2012OPPFOPPOSITION PAPERS RECEIVED AT TTAB—
Sep 4, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 4, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 15, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 27, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 27, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 27, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Jul 27, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 27, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 27, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 26, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 19, 2012DOCKASSIGNED TO EXAMINER—
Jul 19, 2012ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 9, 2012PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 27, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 27, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 27, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Jun 27, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 27, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 27, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 21, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 21, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 15, 2012ALIEASSIGNED TO LIE—
Jun 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 18, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2011DOCKASSIGNED TO EXAMINER—
Aug 24, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Aug 23, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 22, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance