USPTO serial 85445369
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Dusseldorf, DE
Dusseldorf, DE
Dusseldorf, DE
DUSSELDORF, DE
DUSSELDORF, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul F. Kilmer
Paul F. Kilmer HOLLAND & KNIGHT LLP800 17th Street, NwSuite 1100WASHINGTON, DC 20006| Class | Description | Status | First use |
|---|---|---|---|
| 036 | [ Real estate affairs, namely, real estate agencies, real estate brokerage, real estate consultation; financial consulting services; management of land, namely, management of buildings, real estate management; administration and management of buildings, building installations, namely, rental property management and commercial property management ] | SECTION 8 - CANCELLED | — |
| 037 | [ Building construction; construction management services; providing technical information in the field of building construction; technical planning, namely, construction planning; providing fire protection expertise, namely, fire alarm installation and repair ] | SECTION 8 - CANCELLED | — |
| 042 | Scientific and technological services, namely, scientific laboratory services, scientific research, scientific analysis and testing in the field of [ construction and ] architecture; providing scientific information in the fields of architecture and building construction, including building drafting and urban planning; providing technical information in the field of architecture; architecture; architectural consultancy; providing technical expertise in the field of [ engineering and ] architecture; industrial design; design services in the field of architectural design; product development services; technical planning, namely, planning and design of buildings and infrastructure systems for buildings; [ construction drafting; ] technical drafting; technical planning of technical installations for buildings, namely, planning and design of technical building installations; [ consultancy, physics services, and engineering services in the field of construction physics, architectural and room acoustics; consultancy and engineering services in the field of facade design planning; ] technical design and planning of daylight and artificial light in buildings, structural installations and outdoor installations; consultancy, [ engineering, ] and architecture services in the field of green buildings, namely, sustainable, ecological and energy efficient planning of buildings and technical installations; [ physical investigations and services, namely, aerodynamic and wind-tunnel testing, research, and analysis; construction drafting, including structural planning and planning of special structures; geological survey and foundation soil scientific studies and reports, in particular foundation soil reports into the bearing capacity of the foundation soil when constructing buildings; ] technical design and planning of installations for transporting persons and items and pieces of goods, specifically, lifts and escalators; [ providing fire protection expertise, namely, design and inspection of fire alarm, detection, and suppression systems; ] architectural planning, namely, design and development of efficient, communication-enhancing office workplaces, and design, development and analysis of room schemes; technical drafting, planning and design of daylight and artificial light in buildings, structural installations and outdoor installations; interior architectural services and architectural services, including planning services in the field of outdoor installations and green building; [ technical drafting, planning and design of security technology installations in buildings; ] technical design and planning of the conversion and preservation of listed buildings, listed structural installations and listed outdoor installations; technical drafting, planning and design of artwork placement in buildings and structural installations and outdoor installations; technical drafting, planning, and design of analogue and digital communications systems and signage; [ computer software design and computer network design ] | ACTIVE | — |
| 044 | Landscape architecture, namely, landscape design, landscape gardening | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 17, 2023 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Sep 17, 2023 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Sep 17, 2023 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Sep 17, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 9, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Feb 15, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Mar 12, 2022 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Nov 6, 2021 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Nov 6, 2021 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Aug 20, 2021 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 7, 2021 | PRA8 | POST REGISTRATION ACTION MAILED - SEC. 8 | — |
| Dec 4, 2020 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jun 30, 2020 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Mar 25, 2020 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jan 29, 2020 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 25, 2019 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Sep 19, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 11, 2019 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Mar 12, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 12, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 27, 2012 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Dec 27, 2012 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Dec 26, 2012 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Dec 17, 2012 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Nov 13, 2012 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 18, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 18, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 13, 2012 | PAPER RECEIVED | — | |
| Aug 29, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 11, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 10, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 10, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 10, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 2, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jul 25, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 2, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 2, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 2, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 31, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 18, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 15, 2011 | NWAP | NEW APPLICATION ENTERED | — |