Drawing for Serial No. 85481955

USPTO serial 85481955

Serial No. 85481955

Reviewed by CopyMark Law Group

Reg. 4693552Status 710
Filing date
Status date
Registration date
Feb 24, 2015
Examiner
GUTTADAURO, JULIE MARIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with Serial No. 85481955?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Henry B. Ward, III

HENRY B. WARD, III MOORE & VAN ALLEN, PLLCPO BOX 13706RESEARCH TRIANGLE PARK, NC 27709UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for fastening solar installations, solar modules and laminates; metal building materials, namely, connecting products in the nature of metal pipe connectors, metal sheets, metal mountings, metal mounting sheets, cross beams, retaining tubes, front plates, profiles, carrier rails; transportable buildings of metal; pipes and tubes of metalSECTION 8 - CANCELLED—
019Mooring bollards, not of metal; reinforcing materials, not of metal, for building; asphalt; girders, not of metal; huts, namely, non-metallic storage sheds; construction timber; worked timber, namely, partly processed timber; building materials, not of metal, namely, non-metallic structures for mounting solar panels; non-metallic buildings, namely, non-metallic transportable buildings, non-metallic portable buildings, non-metallic pre-fabricated buildings; concrete; concrete building elements, namely, blocks, bricks, posts, slabs, panels; bituminous products for building, namely, asphalt, sealants for roofing and driveways, coatings for roofing; covers, not of metal for energy installations and components thereof; non-metallic asphalted and cardboard tiles for building; non-metallic roof coverings; non-metallic façade panels for construction purposes; asphalted roofing cardboard; tiles, not of metal; carpentry scantlings in the nature of small timber; roofs, not of metal, with integrated solar cells; drain pipes, not of metal, made of concrete, earthenware, or sandstone; non-metallic refractory construction materials; non-metallic scaffolding; non-metallic construction materials, namely, xylolith; gravel; artificial stone; posts, not of metal; non-metallic rigid piping for building; non-metallic fencing stays; utility poles not of metal; water tanks of masonry for industrial purposes; non-metallic window and door frames for buildingsSECTION 8 - CANCELLED—
035Advertising and marketing; business management services in the fields of environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage; business administration in the fields of environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage; providing office functions; building promoter services, namely, organizational or business preparation of building projects and office functions, namely, organizational preparation of building projects, in particular for installations for generating renewable energy; business organization consultancy; organizational project management services for others in the fields of environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage; business management services in the planning and start-up phase, for projects for generating renewable energy, including being long-term business services; retail store services and wholesale store services featuring goods and installations for renewable energy, energy control and energy storage; retail store services and wholesale store services featuring goods relating to generation, energy control and energy accumulation; retail store services and wholesale store services featuring solar modules, inverters, assembly systems, charge regulators, batteries, systems for the inspection and control of installations for renewable energy generation; providing a searchable database featuring commercial and business contactsSECTION 8 - CANCELLED—
036Insurance administration; financial affairs in the fields of environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage, monetary affairs in the field of environmental technology, renewable energy, energy generation, energy control, and energy storage; real estate agencies, appraisal, brokerage, consultation; building promoter services, namely, the financial preparation and financial management of building projects; real estate management of land used for environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage facility management, namely, management of buildings and installations used for environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storageSECTION 8 - CANCELLED—
037Building construction; repair of construction machines and construction equipment, repair of water vehicles, repair of process technology installations for environmental technology; installation services, namely, installing solar and photovoltaic systems; building construction information; building construction supervision; building construction monitoring, namely, construction management services and building inspection in the course of building construction; building construction, namely, the implementation of building projects; construction, namely, conducting building projects; building construction supervision; building construction plan; building construction consultationSECTION 8 - CANCELLED—
042Architectural consultancy; architectural services, namely, architectural design services; engineering surveying; geological expertise, namely, geological surveying; land surveying; research and development for others in the fields of environmental technology, solar technology, renewable energy, energy generation, energy control, and energy storage; conducting of feasibility studies for technical projects; technical consultation in relation to building project engineering; engineering work; scientific laboratory services, namely, technical measuring and testing laboratory services; construction drafting; research in the field of physics; consulting services in the field of environmental assessment and planning; environmental assessment services, namely, research in the field of environmental protection; structural and civil engineering servicesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 1, 2021C8..CANCELLED SEC. 8 (6-YR)—
Feb 24, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 24, 2015R.SRREGISTERED-SUPPLEMENTAL REGISTERYour mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application.
Jan 21, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 20, 2015CNTAAPPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER—
Jan 16, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 16, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 16, 2015TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 8, 2014ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 8, 2014PBMRWITHDRAWN FROM PUB - MANAGING ATTORNEY REQUEST—
Jun 28, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 28, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 26, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 14, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 14, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 14, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 25, 2014ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 25, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 20, 2014ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 20, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 18, 2014FAXXFAX RECEIVED—
Apr 17, 2014FAXXFAX RECEIVED—
Nov 8, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Nov 8, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Nov 8, 2013CNSLSUSPENSION LETTER WRITTEN—
Nov 8, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 8, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 1, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
May 31, 2013GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
May 31, 2013GNSIINQUIRY TO SUSPENSION E-MAILED—
May 31, 2013CNSISUSPENSION INQUIRY WRITTEN—
May 28, 2013RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
May 15, 2013ALIEASSIGNED TO LIE—
Nov 15, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Nov 15, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Nov 15, 2012CNSLSUSPENSION LETTER WRITTEN—
Oct 4, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 3, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 3, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2012DOCKASSIGNED TO EXAMINER—
Dec 3, 2011MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Dec 2, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 1, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance