Drawing for ENGINEERING LASTING RELATIONSHIPS

USPTO serial 85484628

ENGINEERING LASTING RELATIONSHIPS

Reviewed by CopyMark Law Group

Reg. 4314103Status 710
Filing date
Status date
Registration date
Apr 2, 2013
Examiner
MULLEN, MARK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ENGINEERING LASTING RELATIONSHIPS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

William P. Matthews

WILLIAM P. MATTHEWS FOULSTON SIEFKIN LLP1551 N WATERFRONT PKWY STE 100WICHITA, KS 67206-4466UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Inspection services in the course of construction of residential, commercial, industrial buildings; consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; land development services, namely, planning and laying out of residential and/or commercial communities and commercial buildings; consulting services in the field of residential, commercial, or industrial real estate site selection; construction management, planning, consultation and supervision servicesSECTION 8 - CANCELLEDMar 6, 2012
042Engineering; drafting of plans and engineering drawings for others; civil engineering services; custom design services, testing services, inspection services and technical consulting services in the field of civil engineering; engineering services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; custom design of drainage, erosion, stormwater, watershed and flood control and management systems and consulting services in connection therewith; engineering services for the design and construction of airports and airfields, and consulting services in connection therewith; facilities design engineering services and consulting services in connection therewith; design planning and engineering of buildings and infrastructure systems for buildings; engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; electrical engineering; foundation engineering, foundation testing and design services for others, and consulting services in connection therewith; engineering services in the field of energy efficiency; engineering services in the fields of traffic and transportation; design engineering services in the field of transportation systems and consulting services in connection therewith; environmental engineering, testing and inspection services; geoenvironmental engineering; geotechnical testing services and consulting services in connection therewith; hydrological and hydraulic engineering and design engineering services; providing testing and inspection services in the field of hydrological and hydraulic sciences and consulting services in connection therewith; mechanical engineering; testing inspection and consulting services in the field of mechanical systems; structural engineering design services; testing, inspection and consulting services in the field of structural engineering; construction engineering and design services for others and providing consulting services in connection therewith; traffic and transportation engineering; transportation and traffic design planning and integration services; materials engineering; materials testing, analyzing, evaluation, and testing services and consulting services in connection therewith; engineering, technical, architectural, geological, topographic, land, and roadway surveyingSECTION 8 - CANCELLEDMar 6, 2012
045Consulting services in the field of residential, commercial, or industrial real estate zoning permitting and complianceSECTION 8 - CANCELLEDMar 6, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 8, 2019C8..CANCELLED SEC. 8 (6-YR)—
Apr 2, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 26, 2013SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED—
Feb 25, 2013REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Feb 24, 2013ALIEASSIGNED TO LIE—
Feb 13, 2013CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jan 31, 2013SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jan 29, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 9, 2013IUAFUSE AMENDMENT FILED—
Jan 9, 2013EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 10, 2012NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 15, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 25, 2012NPUBNOTICE OF PUBLICATION—
Mar 20, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 14, 2012DOCKASSIGNED TO EXAMINER—
Dec 6, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 5, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance