Drawing for SMEC

USPTO serial 85485403

SMEC

Reviewed by CopyMark Law Group

Reg. 4427365Status 800Registered
Filing date
Status date
Registration date
Nov 5, 2013
Examiner
BHANOT, KAPIL KUMAR
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with SMEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John K Park

John K Park Park Law Firm3255 Wilshire Blvd. Suite 1602Los Angeles, CA 90010UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007[ Gas welding machines; Soldering irons, gas-operated; Gas-operated Soldering apparatus; Thermic lances, namely, power-driven cleaning lances to remove scale and sludge in factories; Power operated spray guns; Machine tools for removing waste material; slide rests, namely, powered ramps; Pneumatic shears; Pneumatic Hammers; Industrial machine presses; ] Metalworking machine tools; [machine tool holders; punching presses; Bending machines; Grinders; Metalworking machines, namely, perforating machines; Toolholders for metalworking machines; Mechanical presses; ] Drilling machines; Milling machines; [ Rolling mills; Hydraulic presses; Shearing machines; Cutting machines; Tubing mills; Perforating machines; Punching presses; Planing machines; Shaping machines; Horning machines; Rolling machines for rolling metals; Metal drawing machines; Stands for machines; tables specially adapted to hold powered machinery; hand held electric drills; industrial machine presses; Screw grinding machines; Threading machines; Grinding machines with spiral bevel gears; Involute grinding machines; machine tool for making notches; Internal grinding machines; machine tools for tapping nuts; Machine tools for splicing wires; Die-stamping machines; Diamond-pointed metal-cutting tools; Die-cutting and tapping machines; Drop-forging machines; Forge bellows; Forging moulds; Drilling machines; drill bits for machines; drill chucks for power drills; drilling machines and parts therefor; Racket stringing machines; Radial drills; Lapping machines (for metalworking); laser welding, cutting, and engraving machines; machine tools for riveting; friction pressure welding torches; ] Machining centers; Milling-drilling machines; [ Milling machines; Milling cutters for milling machines; Machine tools, namely, powered machines for cutting or shaping metals; Bending machines; Boring machines; Drilling machines; Embossing machines; Broaching machines; Blanking presses; Injection moulding machines; Oxy-acetylene welding and cutting machines; Oxygen acetylene welding cutters; Oxygen cutting devices; ] Lathes; Lathes for metalworking; [processing machines, namely, dissolving machines for plastic; Hydraulic presses; Grindstones; machine tools for swaging of metal and plastics; Drill bits for rock drilling; Rolling mills; Rolling mill cylinders; Mangles; compressor machines; compressor moulding machines; air-powered tools, namely, drills and hammers; Grinding machines for metalworking; Continuous metal casting machines; Continuous casting machines; Heat shock machines, namely, heat transfer presses; Wire forming machines; Wire extruding machines; Gas-operated Soldering irons; Glaziers' diamonds being parts of machines; Oil hydraulic presses; Hydraulic hammers; Automatic stamping machines; Assembly lines, namely, a series of machines for assembling bicycles in successive stages; Power operated Shears; Electric Welding machines; Electric pile drivers; Electrical drills; Electric hammers; Electric hand-held drills; electric beam welding machines; Milling cutters for milling machines; Machines and machine tools for the cutting and forming of materials; catalytic converters for steel works; Tubing mills; Engraving machines; Compression moulding machines; Casting machines; Foundry machines, namely, moulding machines; Machine parts, namely, molds for use in the manufacture of bicycles; chucks for power drills; Supersonic waves electric welding machines; Rechargeable hedge cutters; machine parts, namely, blades; Core drilling bits; machine for contouring metal; power operated automatic tire removing and installing devices; wood beating machines; Taps; Paper trimming machines for commercial or industrial use; electric tile hammers and power hammers; Bellows; mechanical presses; fraises, namely, milling machines, Free-form forging machines; electronic Feeders for animals; electric hammers; power-operated razor blade sharpeners; Shaping machines; Rotary grinding machines; ] Industrial Robots [ ; Semiconductor processing machines; Semiconductor wafer processing machines; Industrial Sewing robots; loading and unloading machines; automatic stamping machines; adhesive tape dispensing machines; Electronic label printing machines for commercial use; Mortising drilling machines; elevators; drills for the mining industry; Stone working machines, namely, rock drills; woodworking machines, namely, circular saws; Pulp refining machines; Printing machines; Leather-working machines; machines for the manufacture of glass; Painting machines; Packaging machines; Ignition devices for motors of land vehicles; power transmission belts for machines; Steam engine boilers for power generation; pumps for machines; compressors as parts of machines; Power transmissions and gearing for machines; Bellows; Shock absorbers for machines, other than for vehicles; brakes for machines; valves being parts of machines; piston rings; machines for the manufacture of rubber; Current generators; motors other than for land vehicles ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 27, 2024NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Mar 27, 2024RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Mar 27, 202489AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Mar 27, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 8, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Feb 8, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 8, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 8, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 2, 2023E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 5, 2022REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Dec 1, 2019NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Dec 1, 2019C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 1, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 28, 2019E815TEAS SECTION 8 & 15 RECEIVED—
Nov 5, 2018REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Nov 5, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 20, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 20, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 31, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 18, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 18, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 18, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Jul 18, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 18, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 18, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
May 3, 2013GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 3, 2013GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 3, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 11, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Oct 15, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 15, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Oct 15, 2012CNSLSUSPENSION LETTER WRITTEN—
Oct 12, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 12, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 12, 2012ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 26, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 26, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Jun 26, 2012CNSLSUSPENSION LETTER WRITTEN—
Jun 25, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 25, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 15, 2012ALIEASSIGNED TO LIE—
Jun 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 14, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2012DOCKASSIGNED TO EXAMINER—
Dec 7, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 5, 2011NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance