USPTO serial 85485403
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Changwon-si, KR
Changwon-si, KR
Changwon-si, KR
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John K Park
John K Park Park Law Firm3255 Wilshire Blvd. Suite 1602Los Angeles, CA 90010UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Gas welding machines; Soldering irons, gas-operated; Gas-operated Soldering apparatus; Thermic lances, namely, power-driven cleaning lances to remove scale and sludge in factories; Power operated spray guns; Machine tools for removing waste material; slide rests, namely, powered ramps; Pneumatic shears; Pneumatic Hammers; Industrial machine presses; ] Metalworking machine tools; [machine tool holders; punching presses; Bending machines; Grinders; Metalworking machines, namely, perforating machines; Toolholders for metalworking machines; Mechanical presses; ] Drilling machines; Milling machines; [ Rolling mills; Hydraulic presses; Shearing machines; Cutting machines; Tubing mills; Perforating machines; Punching presses; Planing machines; Shaping machines; Horning machines; Rolling machines for rolling metals; Metal drawing machines; Stands for machines; tables specially adapted to hold powered machinery; hand held electric drills; industrial machine presses; Screw grinding machines; Threading machines; Grinding machines with spiral bevel gears; Involute grinding machines; machine tool for making notches; Internal grinding machines; machine tools for tapping nuts; Machine tools for splicing wires; Die-stamping machines; Diamond-pointed metal-cutting tools; Die-cutting and tapping machines; Drop-forging machines; Forge bellows; Forging moulds; Drilling machines; drill bits for machines; drill chucks for power drills; drilling machines and parts therefor; Racket stringing machines; Radial drills; Lapping machines (for metalworking); laser welding, cutting, and engraving machines; machine tools for riveting; friction pressure welding torches; ] Machining centers; Milling-drilling machines; [ Milling machines; Milling cutters for milling machines; Machine tools, namely, powered machines for cutting or shaping metals; Bending machines; Boring machines; Drilling machines; Embossing machines; Broaching machines; Blanking presses; Injection moulding machines; Oxy-acetylene welding and cutting machines; Oxygen acetylene welding cutters; Oxygen cutting devices; ] Lathes; Lathes for metalworking; [processing machines, namely, dissolving machines for plastic; Hydraulic presses; Grindstones; machine tools for swaging of metal and plastics; Drill bits for rock drilling; Rolling mills; Rolling mill cylinders; Mangles; compressor machines; compressor moulding machines; air-powered tools, namely, drills and hammers; Grinding machines for metalworking; Continuous metal casting machines; Continuous casting machines; Heat shock machines, namely, heat transfer presses; Wire forming machines; Wire extruding machines; Gas-operated Soldering irons; Glaziers' diamonds being parts of machines; Oil hydraulic presses; Hydraulic hammers; Automatic stamping machines; Assembly lines, namely, a series of machines for assembling bicycles in successive stages; Power operated Shears; Electric Welding machines; Electric pile drivers; Electrical drills; Electric hammers; Electric hand-held drills; electric beam welding machines; Milling cutters for milling machines; Machines and machine tools for the cutting and forming of materials; catalytic converters for steel works; Tubing mills; Engraving machines; Compression moulding machines; Casting machines; Foundry machines, namely, moulding machines; Machine parts, namely, molds for use in the manufacture of bicycles; chucks for power drills; Supersonic waves electric welding machines; Rechargeable hedge cutters; machine parts, namely, blades; Core drilling bits; machine for contouring metal; power operated automatic tire removing and installing devices; wood beating machines; Taps; Paper trimming machines for commercial or industrial use; electric tile hammers and power hammers; Bellows; mechanical presses; fraises, namely, milling machines, Free-form forging machines; electronic Feeders for animals; electric hammers; power-operated razor blade sharpeners; Shaping machines; Rotary grinding machines; ] Industrial Robots [ ; Semiconductor processing machines; Semiconductor wafer processing machines; Industrial Sewing robots; loading and unloading machines; automatic stamping machines; adhesive tape dispensing machines; Electronic label printing machines for commercial use; Mortising drilling machines; elevators; drills for the mining industry; Stone working machines, namely, rock drills; woodworking machines, namely, circular saws; Pulp refining machines; Printing machines; Leather-working machines; machines for the manufacture of glass; Painting machines; Packaging machines; Ignition devices for motors of land vehicles; power transmission belts for machines; Steam engine boilers for power generation; pumps for machines; compressors as parts of machines; Power transmissions and gearing for machines; Bellows; Shock absorbers for machines, other than for vehicles; brakes for machines; valves being parts of machines; piston rings; machines for the manufacture of rubber; Current generators; motors other than for land vehicles ] | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 27, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Mar 27, 2024 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 27, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Mar 27, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 8, 2024 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Feb 8, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 8, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 8, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 2, 2023 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Nov 5, 2022 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Dec 1, 2019 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Dec 1, 2019 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Dec 1, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 28, 2019 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Nov 5, 2018 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Nov 5, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 20, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 20, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 31, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 18, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 18, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 18, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 18, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 18, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 18, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 3, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 3, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 3, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 18, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 18, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2013 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Oct 15, 2012 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Oct 15, 2012 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Oct 15, 2012 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 12, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 12, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 12, 2012 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jun 26, 2012 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jun 26, 2012 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jun 26, 2012 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jun 25, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 25, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 15, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jun 4, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 14, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 14, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 7, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 5, 2011 | NWAP | NEW APPLICATION ENTERED | — |